akhil.laddha@mobiusarchitects.co. in www.mobiusarchitects.co. in UnnAN OFdox AR CHoUREI FORM 1 ARCHITECT'S CERTIFICATE (To be submitted at the of Money from time of Registration of Ongoing Project and for with drawal Designated Account - Building/Wing wise) To, Date: 07/10/202 1 Nanda Properties, Amravati Ceriticate of Percentage of Completion of ConstructionWork of: Nanda HiLite naving VanaRERA No. P50300018483 being develoned by Nanda Properties as on (30/972024) Sir, Vwe Ar. Akhil Laddha have undertaken assignment as Architect/Licensed Surveyor of certifying rercentage of Completion of Construction work of Nanda HiLife having MahaRERA No. P50300018483. based on Ste Inspection, with respect to Layout/each of the Building / Wing of the aforesaid Real EState Project. Icertify that as on the date of this certificate, the Percentage of Work done for each of the building / Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table-A Layout/Building/Wing Number (Tobe prepared separately for each Building /Wing of the Project) SrNo Tasks/Activity Percentage of Actual Work Done (1) (2) (As on date of the Certificate) 1 Excavation 100% 2 Basements (if any) 3 Number of Podiums (if any) 01 MOBIUS ARCHITECTS Head Office: 1001, 10th Floor, Kamdhenu, Business Bay, Sector 1, Nerul, Navi Mumbai-400706 | PH. 022 27713161 Branch Office: 301-3, 3rd Floor, Dreamz-i-Landmark, Rajkamal Square, Amravati-444 601 | PH. 0721 2563161 akhil addhaVww.@mobim uussaarrcchihttee 100% 4 Plinth 100% 5 Stilt Floor 100% 6 slabs of super structure 100% 7 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises Sanitary Fittings within the Flat/Premises. 85% Staircases, Lifts Wells and Lobbies at each Floor level 100% connecting Staircases and Lifts, Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 100% completion of terrace with the waterproofing of the building. 11 Installation of lifts, water pumps,Fire Fighting 100% Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC,Finishing toentrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate MOBIUS ARCHITECTS HeadOffice: 1001, 10th Floor, Kamdhenu, Business Bay, Sector 1, Nerul, Navi Mumbai-400706 | PH. 022 27713161 Branch Office: 301-3, 3rd Floor, Dreamz-Landmark, Rajkamal Square, Amravati-444 601 | PH. 07212563161 akhil.Jaddha(@mobiusarchitects.co. in www.mobiusarchitects.co. in TABLEB Common Areas (Internal and External Development Works) in respect of the Registered Pnase/ Project Number S. No. Common Roads and Facilities, Amenities Proposed Percentage of Work Details (Yes/No) done 1 Internal Roads &Foothpaths 95% 2 Water Supply 85% 3 Sewerage (chamber, sewage lines), 100% Storm WNater Drains 4 Storm Water Drains 100% 5 Landscaping &Tree Planting 60% 6 Street Lighting 100% 7 CommunityBuilding Treatment and disposal of sewage and sullage water 9 Solid Waste management & Disposal 100% 10 Water conservation, Rain water 100% harvesting 11 Energy management 12 Fire protection and fire safety 80% requirements 13 Electrical meter room, sub-station, 80% receiving station MOBIUS ARCHITECTS Head Office: 1001, 10th Floor, Kamdhenu, Business Bay, Sector 1, Nerul, Navi Mumbai-400706 I PH. 022 27713161 Branch Office: 301-3, 3rd Floor, Dreamz-Landmark, Rajkamal Square, Amravati-444 601 | PH, 0721 2563161 akhil.laddha@mobiusarchitects. co.in www.mobiusarchitects.co.1n 14 Other Yours ^ince