I I I II ARCHITECTS I STRUCTURAL DESIGNER I GOW.REGISTERED VALUER I CHARTERED ENGINEER Annexure A FORM 2 (see Regulation 3l ENGI NEER'S CERTI FICATE (To be submitted at the time of Registration of Ongoing Project and the withdraural of Money frcm Designated Account-Project Wise ) (Form I't Ap ria 2024 to 30th June 2024) Date-O2lO8l2O24 To, M/s. N & LASSOCIATES 56, MONALISA ARCADE, NEAR GOID GYM, M J COLTEGE ROAD, sHtvRAM NAGAR, JATGAON 425001 Subject: Certificate of Cost Incurred for Development of SAI CHARAN RESIDENCY" having MahaRERA Registration Number P499@O76732 being developed by N & t ASSOCIATES. Sir, I /We Anand Mukund have undertaken assignment of certifying Estimated Cost for SAI CHARAN RESIDENCY having MahaRERA Registration Number P49900075732 being developed by N&L ASSOCIATES. 2. We have estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the drawings/plans made available to us for the project under reference by the Developer/ Consultant. The Schedule of items and quantity required for the entire work as calculated by Anand Mukund. Quantity Surveyor appointed by Developer /Engineer, the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us to ascertain/ confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aforesaid project under reference at Rs.2,83,66,8fi/-. (Total of Table A and B) at time of registration. The estimated Total Cost of Project is with reference to the Civil, MFP and Allied works required for completion of the apartments and proportionate completion of internal & external works, as per Specifications mentioned in agreement of sale and for the purpose of obtaining occupation certificate /completion certificate for the Building(s) /Wing(s) /Layout/Plotted Development from the Municipal Corporation of The City of Jalgaon being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost incurred till date is calculated at Rs. 90,45,084/- (Total of Table A an The amount of Estimated Cost incurred is calculated on the basis of input materials/services d unit cost of these items. ND A.t"Y[lr.llB 104, First Floor, Mayuresh Apartment, Near Mahesh Pragati Hall, Ring Road, Jalgoon425001 Mobile : +91 9326299499, Email : mukunlsassociates@gmail.com I T I IARCHITECTS ISTRUCTURALDESIGNERI GOW.REGISTEREDVALUERICHARTEREDENGINEER 5.The Balance Cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate completion of internal & external works, as per specification mentioned in agreement of sale, of the Project is estimated at Rs.i,93,21,7161- (Total of Table A&B) 6. I certifo that the Cost of the Civil, MEP and allied work for the apartments and proportionate internal & external works, as per specifications mentioned in agreement of sale, of the aforesaid Proiect as completed on the date of this certificate is as given in Table A and b below: TABTE A Buifding / Wing I Lavotxl Plotted Development bearing Number Plot No. 1/t4&145 or called Sai Charan Residency (to be prepared separately for each Plotted Development of the Real Estate Sr.No Particulars Amount (ln Rs.) 1. Totaf Estimated Cost of the Buildine/ Wing/ Layout/ Plotted 2,83,66,8OOi- Devef opment as on date of Registration is 2L/O6/2O24 2. Cost incurred as on date of certificate 30/0612024 90,45,084/- 3. Work done in Percentage (as Percentage of the estimated cost) 31.89% 4. Balance Cost to be Incurred (Based on Estimated Cost) 1,93,21,7161- 5. Cost lncurred on Additional./ Extra ltems not included in the ol- Estimated Cost (Table-C) \ \ ANAND A. MUKUND M.E.(Civil) J.M.C.Lic.No.523 First Floor,MaYuresh APt' Ring Road,Jalgaon-425001 Mob.9326299499 1il, Fint Floor, Mayuresh Apartment, Near Mahesh Pragati Hall, Ring Road, Jalgaon425001 Mobile : +91 9326299499, Email : mukndsassociates@gmail.com II I JEARcHrTEcrs tsrRUcruRALDEsrcNER I cow.REGTsTEREDVALUER TcHARTEREDENGTNEER L. The scope of work is to complete Registered Real Estate Project as per drawing approved from - time to time and as per specifications mentioned in agreement of sale. 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor. whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked and in case quantity are being calculated by office of Engineer, the name of person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked. 3. (**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required/ escalation of cost etc. As this is an estimated cost any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred /tobe incurred. 4. All components of work with Specification are indicative and not exhaustive. Please specify if there are any deviation/qualification Example: Any deviation in input material used from specification in agreement of sale. TABTE C List of Extra /Addition/Deleted ltems considered in cost (Which were not part of the original Estimate of Total Cost) Sr.No List of Extra/Additional/Deleted ttems Amount (ln Rs.) 1. 2. ANAND A. MUKUNq M.E.(Civil) J'.M.C.Lic.No.523 First Floor,MaYuresh APt' Ring Road,Jalgaon-425001 Mob.9326299+99 104, First Floor, Mayuresh Apartment, Near Mahesh Pragati Hall, Ring Road, Ja[aon425001 Mobile : +91 9326299499, Ema1 : mukundsas.sociates@gmail.com III 'c I T I TARCHITECTS ISTRUCTURALDESIGNERI GOW,REGISTEREDVALUERICHARTEREDENGINEER TABTE B nternal & External Development works in Respect of the Registered phase Sr.No Particulars Amount (ln Rs.) L, Total Estimated Cost of the Internal and External Development Works L0,00,000/- including amenities and Facilities in layout as on date of Registration is 27/06/2024 2. Cost incurred as on date of certificate 30/06/2024 0.00 3. Work done in Percentage (as Percentage of the estimated cost) o.ooyo 4. Balance Cost to be Incurred (Based on Estimated Cost) 10,00,000/- 5. Cost Incurred on Additional/ Extra ltems not included in the Estimated ol- Cost (Table-C) Yours Faithfully, ANAND A. MUKUND M.E.(Civil) J.M.C.Lic.No.523 First Floor,MaYuresh APt. ANAND A. MUKUND Fting Road,Jalgaon-425001 Locaf Authority License no.2M Mob.9326299499 Agreed Accepted by: 104, Fist Floor, Mayuresh Aparlment, Near Mahesh Pragati Hall, Ring Road, Jalgaon425001 Mobile : +91 9326299499, Email : mukundsassociates@gmail.com