-1- ENGINE€RS ARCH ITECTS INTERIOR DESIGN E RS 5,8 WING ( Upper Gr Floor ), VI[4ACO TOWER, BUS STAND ROAD, AMRAVATI .444602 ( M S ) T- R,V. B e la n k a r & C o. r"r.,ozzr-zss274o (o) / M s422t sss3s e-mail : rbelankar@gmarl.com FORM-2 I See Regulation 3] ENGINEER,S CERTIFICATE (To be submitted at the time of registration of Ongoing Project and for withdrawal of Money from Designated Account) Date : 1.2-07-2022 To Name :- ADIL CONSTRUCTION Address of Promoter:-Bhagyashree Colony, Camp, Amravati-4446O2' Subject : Certificate of Percentage of Completion of Construction Work of 1 No. of Building .N.No/CTSNo./Survey no. Gut No. 19 Plot no.18 Final demarcated by its boundaries (latitude and longitude of the end points) Gut no:- 3, to the North plot no.4. to the South plot no.2 to the East 30 m road of the west service lane of Division Amravati village Amravati Taluka Amravati District Amravati PIN 444502 Admeasuring 658.58 sq.mts. area being developed by M/S Adil Constructions Partner Aneeque Ahmed Khan Ref : Maha RERA registration N umber :- P'50300018496 Sir, I Rajendra V. Belankar have undertaken assignment as Architect / Licensed surveyor of certifying Percentage of completion of construction work of the above Building of the Project, situated on the plot bearing Gut. No./Surveyno No:-19 Nazul Plot no.18, Layout plot 3 of Division Amravati. Village Amravati Taluka Amravati. District Amravati. PIN 444602 Admeasuring 658.58 sq.mts. area being developed by Following technical professionals are appointed by Owner/ Promoter :- M/S Adil Constructions Partner Aneeque Ahmed Khan' 1. i) M/s Rajendra V.Belankar as L.S. /Architect / engineer ii) Shri Pankaj Subhashrao Deshmukh Structure Consultant iii) as MEP Consultant iv) Shri Rajendra V Belankar Quantity Surveyor 2. We have estimated the cost of the completion to obtain Occupation / Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quality for the entire work as calculated by quality Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the proposed part of building of the aforesaid project under reference as Rs 6,87,00000/- (Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the Town Planning being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost lncurred till date is calculated at 4,80,90,0001- (Total of Table A and B)_. The amount of Estimated Cost lncurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate I Completion Certificate from Town planning (planning Authority) is estimated at Rs 2,06,10,000/-(Total of Table A and B). 5. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: TABLE A Building / Wing bearing Number or called (to be prepared separatety for each Building / Wlng of the Real Estate Project) Sr. Particulars Amounts No. t Total Estimated cost of the buildin as on 19-06-18 3,43,00,000/- Cost incurred as on superstructure wt th brickwork & 2,40,00,000/- 2 rt finishi based on the Estimated cost ) 3 Work done in Percentage 70% (as Percentage of the estimated cost) 4 Balance Cost to be lncurred 1,03,00,000/- (Based on Estimated Cost) 5 Cost lncurred on Additional / Extra ltems not 0.00 included in the Estimated Cost (Annexure A) TABLE B (to be prepared for the entire registered phase of the Rea! Estate Project) Sr. Particulars Amounts No. t Total Estimated cost of the lnternal and External 3,43,OO,OOOI- Development Works including amenities and Facilities in the layout 2 Cost incurred (based on the Estimated cos! ) 3 Work done in Percentage 70% (as Percentage of the estimated cost) 4 Balance Cost to be lncurred 1,03,00,000/- ( Based on Estimated Cost) 5 Cost lncurred on Additional / Extra ltems not 0.00 included in the Estimated Cost (A nnexure A) a e ra n r Civil Engineer L. No: DDMCA/R 12022/ APL/00616