ENGINEERS lf; ARCH ITECTS INTERIOR DESIGN ERS 5,8 WING ( Upper Gr.Floor ), VIMACO TOWER, BUS STAND ROAD, AMRAVATI - 444502 ( M.S.) R.V. B e I a n k a r & C o. r"t 'ozzr-zss274o (o) / M s422t sss3s e-mail ; rbelankar@gma il com FORM 1 3] [see Regulation FICATE ARCH ITECT,S CERTI of Ongoing project and at tfre time of registration (To be submitted from Designated Account ) of Money for withdrawal RERA Regd No'P-50300018496 Date : 2!'0L-2O23 To, Khan' Aneeque Ahmed CamP, Amravati, of Percentage of ComPletion of Construction Subiect Certificate ect [MahaRERA Registration of the Prol work of 1 No' of Building No./Survey No' C'N' No/CTS situa ted on the Plot bearing Numberl its boundaries LaYout Plot 3' dema rcated bY final Nazul Plo t No. 18, to the of the end Point) (Latitude & Long itude to the East road the West the south Plot no'2 North Plot no 4 to Taluka Amravati Dist Amravati Village Amra vati Service lane di VI sion 65 8.58sq'mts Area being Amravati PIN 444602 admeasurtng Constructions' develoPed bY Adil Sir, r/we Rajendra Berankar have undertaken assignment as architect licensed Engineer of certifying percentage of compretion of construction work of Adil_l of the project, situated on the plot bearing C.N.No/CTS No./Survey No. /Final Nazul plot No.Lg, Layout plot 3- of Division Amravati Village Amravati Taluka Amravati Dist Amravati plN 444602 admeasuring 65g.Sgsq.mts. area being developed by Adil Construction. 1. Following technical professionals are appointed by owner/ Promoter :- l. Shri . Mr. Rajendra V.Belankar as L.S./architect & engineer; ll. Shri Pankaj Deshmukh as structural consultant lll. Shri. Ahish Wankhade as MEp consultant lV. Shri. Haribhau as site supervisor Based on sie inspection, with respect to each of the Building/ wing of the aforesaid Rear Estate project, r certify that as on date of this certificate, the percentage of work done for each of the building/wing of the rear Estate project as registered vide number _NA_under MahaRERA is as pertable a herein below. The percentage of the work executed with respect to each of the entire phase is detailed in table B. TABLE A Building / wing No. Sr.no Task/Activity % of work done 1. Excavation ]:OO% 2. Plinth LOO% 3. 0 No of podiums, Still Floor NA 4. 7 No of slabs of Super Structures 1.OO% 5. lnternal Walls, lnternal plaster, Floorings within 75% 6' Flat/Premises, Doors & windows each of the Flat/premises 2s% 7. Sanitary Fitting within the flats/premises SO% 8. Electrical fittings within the flats/premises 50% 9. staircases, Liftwellls & Lobbies at each level connecting staircases & Lifts/ overheaded & Underground water Tanks. External plumbing % External plaster, elevation, completion of terraces with waterproofing of the Building/Wing. gO% 10. lnstallation of Lifts, water pumps, fire fighting fitting & equipment as per CFO NOC, Electrical Fitting, to common areas, Electo, Mechanical equipment compliance to condition of Environment/cRZ Noc, Finishing to Entrance Lobby/s, plinth Protection, paving area appurtenant to Building /wing/ compound wall & all other requirements as may be required to obtain occupation/ completion certificate. o.tL% (For lift completion) TABLE-B lnternal & External Development works in respect of the entire registered phase S.No Common area & facilities proposed % of work done 7. lnternal Roads & Foothpaths NA 2. Water Supply 50% 3. Sewarage (Chamber, Lines, 50% 4. Septic tank, STP) 700% 5. Storm Water Drains O% 6. Landscaping & Tree Planting NA 7. Street Lighting NA 8. Community Buildings NA 9. Treatment & disposal of sawage & Sullage Water NA 10. Solid Waste Management & Disposal O% 1L. Water Conservation, Rain water Harvesting O% 12. Energy Management O% 13. Fire protection & Fire safety requirements. O% L4, Electrical Meter room, sub-station, receiving station. 0% 15. other (Option to add More) Yours Faithfully,