ENGINEERS ARCH ITECTS INTERIOR DESIGNERS f. 5,B-WING ( l.lpper Gr.Floor ), VIMACO TOWER, rr BUS STAND ROAD, AMRAVATI 444602 ( M.S.) T- R.V. B e la n k a r & C o. r"r.,ozzr-zss274o to) /Ms422lsss3s e-mail : rbelankar@gmail.com FORM T [see Regulation 3] ARCHITECT'S CERTI FICATE (To be submitted at the time of registration of ongoing project and for withdrawal of Money from Designated Account ) RERA Regd No. p-50300 01.8496 Date: 1,2-07-2022 To, Aneeque Ahmed Khan, Camp, Amravati, subject : certificate of percentage of compretion of construction work of 1 No. of Buirding of the project [MahaRERA Registration Numberl situated on the prot bearing c.N. No/crs No./survey No. final Nazur prot No. 1g, Layout prot 3, demarcated by its boundaries (Latitude & Longitude of the end point) to the North plot no 4 to the south prot no.2 to the East road the west service lane division Amravati Viilage Amravati raruka Amravati Dist Amravati plN 444602 admeasuring 65g.5gsq.mts Area being developed by Adil Constructions, Sir, l/We Rajendra Belankar have undertaken assignment as architect Licensed Engineer of Certifying percentage of completion of construction work of Adil-1 of the project, situated on the plot bearing C.N.No/CTS No./Survey No. /Final Nazul plot No.18, Layout plot 3_ of Division Amravati Village Amravati Taluka Amravati Dist Amravati PIN 444602 admeasuring 658.58sq.mts. area being developed by Adil Construction. 1. Following technical professionals are appointed by owner/ Promoter:- l. Shri . Mr. Rajendra V.Belankar as L.S./architect & engineer; ll. Shri Pankaj Deshmukh as structural consultant ilt. as MEP consu lta nt lV. Shri. Haribhau as site supervisor Based on sie inspection, with respect to each of the Building/ wing of the aforesaid Real Estate Project, I certify that as on date of this certificate, the percentage of work done for each of the building/wing of the real Estate project as registered vide number _NA_under MahaRERA is as per table a herein below. The percentage of the work executed with respect to each of the entire phase is detailed in table B. TABLE A Building / wing No. Sr.no Task/Activity % of work done 1. Excavation 100% 2 Plinth too% 3 0 No of podiums, Still Floor NA 4 7 No of slabs of Super Structures lO0o/o 5 lnternal Walls, lnternal Plaster, Floorings within 50% 6 Flat/Premises, Doors & Windows each of the Flat/Premises O% 7. Sanitary Fitting within the flats/premises O% 8. Electrical fittings within the flats/premises 25% 9. Staircases, Liftwellls & Lobbies at each level connecting staircases & Lifts/ Overheaded & Underground Water Tanks. External plumbing % External Plaster, elevation, completion of terraces with waterproofing of the Building/Wing. 45% 10. lnstallation of Lifts, Water Pumps, fire fighting fitting & equipment as per CFO NOC, Electrical Fitting, to common areas, Electo, Mechanical equipment Compliance to Condition of Environment/CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, paving area appurtenant to Building /wing/ Compound wall & all other requirements as may be required to obtain occupation/ completion Certificate. O.71% (For lift completion) TABLE.B lnternal & External Development works in respect of the entire registered phase S.No Common area & facilities Proposed % of work done 1. lnternal Roads & Foothpaths NA 2. Water Supply loo/o 3. Sewarage (Chamber, Lines, 70% 4. STP) Septic tank, 1O0% 5. Storm Water Drains Oo/o A Landscaping & Tree Planting NA 7. Street Lighting NA 8. Community Buildings NA 9. Treatment & disposal of sawage & Sullage Water NA 10. Solid Waste Management & Disposal 0o/o II, Water Conservation, Rain water HarvestinE O% 12. Energy Management 0o/o 13. Fire protection & Fire safety requirements. 0% 1.4.Electrical Meter room, sub-station, receiving station. 0% 15. other (Option to add More) You rs a ithf u lly