FORM 1 (See Regulation 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 30.10.2023 To, Parakh Realties, 379, Jaikisanwadi, Jalgaon Subject: Certificate of Percentage of Completion of Construction Work of PPRL BASERA - JAYNAGAR having MahaRERA Registration Number – P49900050211 being developed by Parakh Realties Sir, We UB Architects have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of PPRL BASERA - JAYNAGAR having MahaRERA Registration Number – P49900050211 being developed by Parakh Realties Based on Site Inspection, with respect to Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Cluster No. 6 Percentage of Actual work Sr. Tasks /Activity done (as on the No (2) date of (1) certificate) (3) 1 Excavation 100 2 Plinth 100 3 Slabs of Super Structure 100 4 Internal walls, Internal Plaster, Floorings, Doors and 75 Windows within Flats/Premises 5 Sanitary Fittings within the Flat/Premises 50 6 Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks 7 The external plumbing and external plaster, elevation, completion of terraces with waterproofing 30 of the Building/Wing, Overall 65% Page | 1 Office: 602-B, 11 Sarvoday, Kher Nagar, Bandra (East), Mumbai – 400051. | Tel: +91 22 2647 7036 Cluster No. 7 Percentage of Actual work Sr. Tasks /Activity done (as on the No (2) date of (1) certificate) (3) 1 Excavation 100 2 Plinth 100 3 Slabs of Super Structure 0 4 Internal walls, Internal Plaster, Floorings, Doors and Windows within Flats/Premises 31 5 Sanitary Fittings within the Flat/Premises 0 6 Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks 0 7 The external plumbing and external plaster, elevation, completion of terraces with waterproofing 0 of the Building/Wing, Overall 33% Cluster No. 8 Percentage of Actual work Sr. Tasks /Activity done (as on the No (2) date of (1) certificate) (3) 1 Excavation 100 2 Plinth 100 3 Slabs of Super Structure 0 4 Internal walls, Internal Plaster, Floorings, Doors and Windows within Flats/Premises 31 5 Sanitary Fittings within the Flat/Premises 0 6 Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks 0 7 The external plumbing and external plaster, elevation, completion of terraces with waterproofing 0 of the Building/Wing, Overall 33% Page | 2 Office: 602-B, 11 Sarvoday, Kher Nagar, Bandra (East), Mumbai – 400051. | Tel: +91 22 2647 7036 Cluster No. 9 Percentage of Actual work Sr. Tasks /Activity done (as on the No (2) date of (1) certificate) (3) 1 Excavation 100 2 Plinth 100 3 Slabs of Super Structure 0 4 Internal walls, Internal Plaster, Floorings, Doors and Windows within Flats/Premises 10 5 Sanitary Fittings within the Flat/Premises 0 6 Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks 0 7 The external plumbing and external plaster, elevation, completion of terraces with waterproofing 0 of the Building/Wing, Overall 30% Cluster No. 10 Percentage of Actual work Sr. Tasks /Activity done (as on the No (2) date of (1) certificate) (3) 1 Excavation 100 2 Plinth 100 3 Slabs of Super Structure 0 4 Internal walls, Internal Plaster, Floorings, Doors and Windows within Flats/Premises 10 5 Sanitary Fittings within the Flat/Premises 0 6 Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks 0 7 The external plumbing and external plaster, elevation, completion of terraces with waterproofing 0 of the Building/Wing, Overall 30% Page | 3 Office: 602-B, 11 Sarvoday, Kher Nagar, Bandra (East), Mumbai – 400051. | Tel: +91 22 2647 7036 Cluster No. 11 Percentage of Actual work Sr. Tasks /Activity done (as on the No (2) date of (1) certificate) (3) 1 Excavation 100 2 Plinth 40 3 Slabs of Super Structure 0 4 Internal walls, Internal Plaster, Floorings, Doors and Windows within Flats/Premises 0 5 Sanitary Fittings within the Flat/Premises 0 6 Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks 0 7 The external plumbing and external plaster, elevation, completion of terraces with waterproofing 0 of the Building/Wing, Overall 20% TABLE-B Common Areas (Internal & External Development Works) in Respect of the Registered Phase/project number Percentage of Actual Sr. Proposed Work done Common areas and Details No. (Yes/No) (as on the Facilities (2) (5) (1) (3) date of certificate) (4) 1. Internal Roads & Y 80 WBM Roads Ready Footpaths 2. Water Supply Y 0 3. Sewerage (chamber, Y 20 Septic Tank ready lines, Septic Tank, STP) 4. Storm Water Drains Y 100 Completed 5. Landscaping & Tree Y 0 Planting 6. Street Lighting Y 0 7. Community Buildings Y 0 Page | 4 Office: 602-B, 11 Sarvoday, Kher Nagar, Bandra (East), Mumbai – 400051. | Tel: +91 22 2647 7036 Percentage of Actual Sr. Proposed Work done Common areas and Details No. (Yes/No) (as on the Facilities (2) (5) (1) (3) date of certificate) (4) 8. Treatment and N - disposal of sewage and sullage water 9. Solid Waste N - management & Disposal 10. Water conservation/ Y 0 Rain water harvesting 11. Energy management N - 12. Fire protection and fire N - safety requirements 13. Electrical meter room, N - sub-station receiving station Overall 20% Yours Faithfully, For UB Architects Digitally signed by UJWAL SATISH UJWAL BHOLE DN: C=IN, O=U B ARCHITECTS, OU=PARTNER, Phone=4c419438fd1b70f4e30bba786f07a 717e4bee42297ed007baf7f334e3730efa7, SATISH PostalCode=400051, S=MAHARASHTRA, SERIALNUMBER=87ef8ef6514575b6a0b1 14c03543929a54507a3d00a90897d4f635 0dd78880ee, CN=UJWAL SATISH BHOLE Reason: I am the author of this document BHOLE Location: your signing location here Date: 2023.11.02 17:14:17-07'00' Foxit PDF Reader Version: 11.0.1 Ar. Ujwal S. Bhole License No. CA/2010/47919 Signature of Promoter Name: Vinaykumar Parakh, Prop. Parakh Realties Date: Page | 5 Office: 602-B, 11 Sarvoday, Kher Nagar, Bandra (East), Mumbai – 400051. | Tel: +91 22 2647 7036