AKASH V. MOHOTA i"' Floor Monalisa complex. d ish a visio n i',1;*?iiilX%?iice station' Raja peth Ph.No. +91 - 855 2900014 FORM 1 ARCHITECT'S CERTIFICATE Date .-31 -07 -2017 :rF to Name :- Dreamz Infrastructure Address of Promoter:- C/o Dreamz Infrastructure Rallies plot Amt Subject : Certificate of Percentage of Completion of Construction Work of I No.of Buildingof the I Phase of the Project Dreamz l,andmark [MahaRERA Registration Number] situated on the Plot bearing No. 122+ 123,12 4ll+12412+l27l4p+l21lSp sheet no.67lc demarcated by its boundaries ( latitude and longitude of the end points) Deshmukh engg. Services to the North, Pande house to the South 30m road to the East, 6 m wide service road on the West of Division Amravati village Gaonthan. Taluka Amravati District Amravati PIN 444601 admeasuring 812.679 sq.mts,area beirrg developed by Dreamz Infrastructure Ref :MahaRERA registration Number :- NA( new registration for ongoing project) Sir, I Akash V. Mohota_have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the lBuilding of the I Phase of the Project, situated on the plot bearing no122+123,12411+'12412+127l4p+127l5p Sheet no.67/c of Division Amravati Village Gaonthan Taluka Amravati.District Amravati. PIN 44460't admeasuring 812'679 sq.mts. area being developed by Dreamz Infrastructure 1. Following technical professionals are appointed by Owner / promoter :- (i) M/sAkashV.Mohota_as Architect (ii) Shri RiteshJ.Laddhaas Structural Consultant (iii) M/s Hb Consultant & Vishwakarma Plumbing Consultancy Services as MEp Consultant (iv) Shri Dnyanoba T. Nagrale as Site Supervisor Based on Site Inspection, with respect to each of the Building/r'Ving of the aforesaid Real Estate project , I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number NA (New reg for outgoing project) unoer MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table Table A Sr Tasks /Activity Percentage of No. work done Excavation 100 'l number of Basement(s) and Plinth 100 1 number of Podiums 0 4 Stilt Floor NA c 6number of Slabs of Super Structure 20 lnternal walls, Internal Plaster, Floorings within Flats/premises, Doors n and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 0 FlaVPremises I Staircases, Lifts Wells and Lobbies at each Floor level connectino 20 Staircases and Lifts, Overhead and Underground Water Tanks o The external plumbing and external plaster, elevation, completion of 0 terraces with waterproofing of the Building^r''/ing, 10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical iittings to Common Areas, electro, mechanical equipment, Compliance to conditions of .environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/r'Ving, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Registered Phase lnternal & External Development works in Respect of the entire Proposed Percentage of Details S.No Coffion areas and Facilities, Amenities (Yes/No) Work done No NA NA 1 lnternal Roads &FoothPaths YES 100 Borewell 2. Water Supply YES 0 3. SeGrag€ (cnamUer' lines Septic Tank STP) j NA NA NA Storm Water Drains YES 0 5. LandscaPing & Tree Plantlng No NA NA 6. Street Lighting No NA NA 7. Community Buildings No NA NA Treatment and dlsposal ol sewage ano sullage water No NA NA 9. Solid Waste management & Disposal 10. -dconservation, Rain water harvesting w-ater YES 0 Energy management YES 0 11 YES 0 Fire protection and fire safety requrrements YES 0 13. Electrical meter room sub-stat'on receiving station NO NA NA 't4. Others ( Option to Add more) Yours FaithfullY Signature & Namer - rrr t{ "$lot^t' AKASH V. MOHOTA ( Architect) (aN97121821)