Mukund AssoCiates BUILDING PLANNERI STRUCTURAL DESIGNERI GOVT. REGISTERED VALUER I CHARTERED ENGINEER ENGINEER'SCERTIFICATE (UT) (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Project wise) To The Ishanavi Construtech Private Limited, Flat No. 104, Mayuresh Apartment, Ring road, Jalgaon Subject: Certificate of Percentage of Completion of Construction Work of "Shivaay Square" situated on the Final Plot no 242 TPS no. IIMehrun (old plot no 35 survey no. 494/1/2) demarcated by its boundaries Plot no 32 to the North Plot no 36 to the East 9.00m Road to the South and9.00m Road to the West of Division Jalgaon village Mehrun Taluka Jalgaon District Jalgaon PIN 425001 admeasuring 2038.81 sg. mts. area being developed by Ishanavi Construtech Private Limited Ref: MahaRERA Registration Number :- P49900032755 Sir, IAr. Anand Amol Mukund have undertaken assignmnent of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being Final Plot no 242 TPSno. II Mehrun (old plot no 35 survey no. 494/1/2) demarcated by its boundaries Plot no 32 to the North Plot no 36 to the East 9.00m Road to the South and 9.00n Road to the West of Division Jalgaon village Mehrun Taluka Jalgaon District Jalgaon PIN 425001 admeasuring 2038.81 sq. mts. area being developed by Ishanavi Construtech Private Limited 1. Following technical professionals are appointed by Owner / Promoter: () Anand Amol Mukund as Architcct/Enginccr; (ii) M/s /Shri / Smt as Structural Consultant (ii) M/s /Shri / Smt as MEP Consultant (iv) M/s /Shri /Smt_ as Quantity Surveyor * 2. We have estimated the cost of the completion to obtain Occupation Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings /plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by quantity Surveyor* appointed by Developer/Engineer, and the assumption of fhe cost of material, labour and other inputs made by developer, and the site inspection carned out by us. 1 104, First Floor, Mayuresh Apartment, Near Mahesh Pragati Hall, Ring Road, Jalgaon-425001. Mobile: +91 9326299499, Email mukundsassociates@gmail com Mukund AsSOCTO|OS CHARIERDLNGINELR BUILDINGPLANNER ost oS.No.| Table A nd 3). The estmntrd 1otol the under relerenCe as Rs 23043038/- (lotul tequired to be comjleted for Civil, MEP 0d allicd wok of project is with relerence o the conemrdCtotijietenl purpose of obaining ocCupation certilicale lor lhe builkdiugu) om he projecl is being, impleentrd. Authorily under whose jurisdicion the nforesaid Cstimated Cost Incurred until dale 31/03/2023in calculated al Rs. J3838745/- Total 4. The is Cleulated on the base of amounl of CAƦmutCl Cost Incurcd of S.No.2 Table A and B).The amount of Total Estimated COst. Buildingl) of th The Balance cost of Complction of the Civil, MEP and Allied works of the 5. cstimailed at lks project to obtain Occupation Certificale from Compelent Aul horily is subjec Rs 9204293(Total of S.No.4Table A and B). Complcted andallicd work for the aforesaid Projcct as 6. I certify that the Cost of the Civil, MEP A and Bbelow: on the date of his certificale is as given in Table TABLE A Building/Wing/Tower bearing Name: "SHIVAAY SQUARE" /Wing of the Real Estate Project) (to be prepared separately for each Building Amounts Sr. No Particulars Total Estinated cost of the building/wing Rs. 22043038/ ason3 /03/2023 date of Registration is Cost incurrcd as on 31/03/2023 Rs. 13258745/ 2 (bascd on the Estimatcd cost 3 Work done in Percenta!e 60.15 (as Percentage of the estimaled cos) 4 Balance Cost to be Incurred Rs. 8784293/ (Bascd on Estimated Cost) 5 Cost Incurred on Additional /Extra Itemsas Rs 0/ On not included in the Estimated Cost (Annexure ^) 2 104, FirstFloor, Mayuresh Apartment, Near Mahesh Pragati Hall,Ring Road, Jalgaon 425001 Mobile 91 9326299499, Email mukundsassociales@gmail com Mukund AssoCiates BULDING PLANNER I STRUCTURAL DESIGNER I GOVT. REGISTERED VALUER |CHARTEREDENGINEER ABLE B Internal & External Development work and common amenitics (to be prepared for the entire registered phase of the Real Estate Project) Amounts Sr. No Particulars Rs.1000000/ 1 Total Estimated cost of the Internal and External Development Works including amenities andFacilities in thelayout as on date of Registration is 3103)2023 Rs. 580000/ 2 Cost incurred as on 30/09/2022 (basedon the Estimated cost ) 58.00% 3 Work done in Percentage (as Percentage of the estimated cost ) Rs.420000/ - 4 Balance Cost to be Incurred (Based on Estimated Cost) Rs. 0_/ 5 Cost Incurred on Additional /Extra Itemsas on not included in the Estimated Cost (Annexure A) Signature of Engineer: Name: Anand Amol Mukund Address: 104, Mayuresh Apartment, Ring road, Jalgaon Aadhar No. :335203877037 Pan no: BBIPM5668L Structural-245) (License No. Engg-244 / ANAND A.MUJKUND M.E.(Civil) J.M.C.Lic.No.244 First Floor,Mayuresh Apt. FRing Road,Jalgaon-425001 Mob.93262 99499 3 mukundsassociates@gmail.com Jalgaon-425001. Mobile: +91 9326299499, Email: Apartment, Near Mahesh Pragati Hal, Ring Road, 104, First Floor, Mayuresh Mukund Associates pll DING PLANNERI STRUCTURAL DESIGNERI GOVT. REGISTERED VALUER CHARTERED ENGINEER * Note 1. The scope of work is to complete entire Real Estate Project as per drawings approved frorm time to time so as to obtain Occupation Certificate. 2. (") Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (") and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentionedat the place marked (). 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real estate Project will result in amendment of the cost incurred/to be incurred. 5. Allcomponents of work with specifications are indicative and not exhaustive. 6. Please specifyif there are any deviations /qualifcations. Example: Any deviations in input material used from specifications in agreement of sale. Table C List of Extra / Additional Items considered in Cost (which were not part of the original Estimate of Total Cost) Sr. no List of Extra / Additional Items Amount (In Rs) 1 Nil Ni 2 Nil Ni 4 104, First Floor, Mayuresh Apatment, Near Mathesh Pragati Hal, Ring Road, Jalgaon-425001. Mobile +91 9326299499, Email :mukundsassociates@gmail.com