Mukund Associates BUILDING PLANNERI STRUCTURAL DESIGNERI GOVI REGISTEREDVALUERICHARTEREDENGINEER ENGINEER'S CERTIFICATE (UT (To be submitted at the time of Reglstration of Ongoing Project and for withdrawal of Money from Designated Account- Project wise) To The Ishanavi Construtech Private Limited, Flat No. 104, Mayuresh Apartment, Ring road, Jalgaon Subject: Certificate of Percentage of Completion of Construction Work of "8hivaay Bquare" situated on the Final Plot no 242 TPS no. II Mehrun (old plot no 35 survey no. 494/1/2) demarcated by its boundaries Plot no 32 to the North Plot no 36 to the East 9.00m Road to the South and 9.00m Road to the West of Division Jalgaon village Mehrun Taluka Jalgaon District Jalgaon PIN 425001 admeasuring 2038.81 sq. mts. area being developed by Ishanavi Construtech Private Limited Ref: MahaRERA Registration Number P49900032755 Sir I Ar. Anand Amol Mukund have undertaken assignment of certitying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being Final Plot no 242 TPS no. II Mehrun (old plot no 35survey no. 494/1/2) demarcated by its boundariea Plot no 32 to the North Plot no 36 to the East 9.00m Road to the South and 9.00m Road to the West of Division Jalgaon village Mehrun Taluka Jalgaon District Jalgaon PIN 425001 admeasuring 2038.81 sq. mts. area being developed by Ishanavi Construtech Private Limited 1. Following technical professionals are appointed by Owner/ Promoter: Anand Amol Mukund as Architect/Engineer ii) M/s /Shri / Smt_ as Structural Consultant (ii) M/s/Shri/ Smt_ a s MEP Consultant (iv) M/s /Shri / Smt _as Quantity Surveyor * 2. We have estimated the cost of the completion to obtain Occupation Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of mnkte rial, labour and other inputs made by developer, and the site inspection carried out by us. ANAND A. MUKUND M.E.(CivH) J . M . C . L i c . N o . 2 4 4 499,Erza1kkaaLMayuresh Apt. 104, First Floor, Mayuresh Apartment, Near Mahesh Pragati Halil, Ring Road, Jalgaon-425001 Mobile +91 9326299499. Ets1 rhiukttidgabpgale@enA 2 MOD. 3. We estimate Total Estimated Cost of completion of the building(s) ofthe aloresaid project under reference as Rs 23043038/- (Total of S.No.1 Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate for the building(s) from the concerned Competent Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred until date 31/12/2022 is calculated at Rs. 13724434/-(Total of S.No.2 Table A and B). The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Buildingls) of the at Rs subject project to obtain Occupation Certificate from Competent Authonity is estimated Rs 9318604 (Total of S.No.4 Table A and B). 6. I certiy that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: TABLE A Building/Wing/Tower bearing Name: "SHIVAAY SQUARE" (to be prepared separately for each Building /Wing of the Real Estate Project) Sr. No Particulars Amounts Total Estimated cost of the building/wing Rs. 22043038/- ason31/12/2022 date of Registration is 2 Cost incurred as on 31/12/2022 Rs. 13192434/- (based on the Estimated cost 3 Work done in Percentage 59.85% (as Percentage of the estimated cost) Balance Cost to be Incurred Rs. 8850604/- (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra Rs.0/ Itemsas on_ not included in the Estimated Cost (Annexure A) = ANAND A.MUKUND M.E Civ J.M.C.Lic No.244 Frst Flour,M.avuresh Apt. Fng Road,Jaigaon-425001 Mcb.93252 99490 TABLE B amenities Internal & External Development work and comrnon of the Real Estate Project) (to be prepared for the entire registered phase Amounts Sr. No Particulars External Rs.1000000/- Total Estimated cost of the Internal and amenities Developrnent Works including of and Facilities in the layout a s on_date Registration is Cost incurred as on 30/09/2022 Rs. 532000/- 2 (basedon the Estimated cost) Work done in Percentage 53.20%% estimated cost) (as Percentage of the Balance Cost to be Incurred Rs.468000/- (Based on Estimated Cost) Cost Incurred on Additional/Extra Rs.0/- included in the Itemsas on _not Estimated Cost (Annexure A) Signature of Engineer: Name: Anand Amol Mukund Address: 104, Mayuresh Apartment, Ring road, Jalgaon Aadhar No. :335203877037 A N A N D A . M U K U N D Pan no: BBIPM5668L (License No. Engg-244 / Structural-245) ME.CIvil) J.M.C.Lic. No.24 Apt. Mayuresh r s t Flor, Ring Fi Road,Jalgaon-425001 Mob.93262 99499 3 Note 1, The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate. 2. ()Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate o f quantity calculated can be relied upon by the Engineer In case of independent quantity surveyor being appointed by Developer, the name has to e mentionedat the place marked (") and in case quantity are being calculated by oflice of Engineer, the name ot calculated should be the person in the ofice of Engineer, who is responsible for the quantity mentionedat the place marked ("). to carry out 3. The estimated cost includes all labour, material, equipment and machinery required entire work. estate for developnent of the Real 4. As this is a n estimated cost, any deviation in quantity required be incurred. Project will result in amendment of the cost incurred/to indicative and not exhaustive. 5. All components of work with specifications are Please specify if there are any deviations / qualifications. Example: Any deviations in input 6. of sale. material used from specifications in agreement Table C considered in List of Extra / Additional Items Cost Estimate of Total Cost) (which w e r e not part of the original Amount (In Rs Sr. no List of Extra / Additional Items Nil Nil Nil 2 Nil NAND A. ILKND E.(Civil) J. .ic.No.244 f yuresh Apt. Fi 1 a a o n 4 2 5 0 0 1 G . 9 3 2 6 2 99490 4