ll SHREE ll Bharat Associates Address: Rajput Vas, Pasvadal, Banaskantha, vadgam (Gujarat) Pin -385210 Email:@lMST/GovtofDelhi/Reg'No.2802Dt.11/082004 Ref. Date.03lOt12026 ANNEXURE A FORM - 24 [See Regulation 3A.] ENGINEER,S CERTIFICATE FOR QUALITY ASSURANCE (Site SuPervisor's Certif icate) (To be submitted at end of the Financial Year) To, The MANGATAM INFRA . Shop No. 27 Mansingka Building Jamner Road Pachora Tal Pachora Dist: Jalgaon 424 zOL QUALITY ASSURANCE CERTIFICATE (certificate No 05 for the year ending 2024 - 25) and workmanship for the work of subject: certificate for quality material used and quality of construction being developed by MAN6ALAM PARK having MahaRERA Registration Number P49900025679 MANGATAM INFRA . Sir, l/WeBharatsinghBhikajiVaghetahaVeundertakentheassignmentofsUpervisionofthisrealestate project. Our ResponsibilitY. TocarryouttheworkinaccordancewiththedevelopmentPerm.ssionandasPertheapprovedplan,to submitcertificateofsupervisionofwork,tocarryoutmaterialtestingin.situorinanauthorizedlaboratory asperprevaillngandapplicablestandards,toensurequalityofworkandworkmanshiPasperprescribed code of practice' specifications, and as per NBC and/or other relevant The details of the quality are as follows: 1. Structural Design, Stability and Testin8 5r Parameters Yes No Remarks No. 1 Whether soil investigations of the site Yes have been conducted before the structural design and soil parameters have been accounted for in the structural design/drawings? 2. Whether Structural Engineer has been YES appointed for the proiect? 3 Whether the inspection registers, site YES order book and quality controltest registers are maintained at the site properly and endorsed by the Engineer- in-Charge? 4 Whether testing facilities to check quality No of material is available at site? 5. Whether the statuary provision for No disaster resistance/earthquake resistant design have been incorporated, specially in case of multistoried construction? 6 Has suitable cognizance been taken on No demarcated flood lines and appropriate precautions taken for protecting the site from flooding considering local flooding issues? 2. lnput Materials 5r Param eters Yes No Remarks No. 1, Whether the following building materials YES confirm to relevant lS/BS/NBC Code, or per lndustry Standards? tf s provide details: A. Cement, Concrete and Coarse YES ga te B. Steel and its allo YES C. Electrical wire, fittings and YES accessories D. Plumbi and sanita fittings YES 2. Whether regular tests of materials and YES NABL Lab Nagpur construction products are being done from accredited labs also? lf yes, details of such labs Whether manufacturer test certifi cate YES for cement, steel, pipes etc. have been obtained and whether supply records are bei maintained? 4 Whether suitable water is bein used for YES construction? A. What is the source of water? Yes I well B. Has water been tested and Yes approved by Engineer-in-Charge before construction? C. Has water been tested NO Not Required subsequently as per requirement? 3. Quality of Workmanship Sr Parameters Yes No Remarks No. 1 Whether works of all the electrical YE5 wiring/ connections/ lift installation / other electrical installations have been carried out under authori2ed /registered electrical engineer and whether records ofthe same has been maintained? 2 Whether all related works of plumbing & YE5 sanitary including installation of water supply systems, drainage systems, sewage systems, sinks, toilets etc. have been carried out under authorized /registered plumbers / sanitary contractors and whether records of the same has been maintained? 3 Whether all the work is being carried out YES under supervision of experienced and skilled professional? Further, whether the workmanship and quality is satisfactory and up to the mark and the work is within the acceptable and permissible Iimits of deviations as per releva nt Code.of Practice? 4 Whether remedial measures are YES undertaken to prevent dampness and leakages? lf yes, provide details 5. Whether safety precautions are YES undertaken during construction activities for all type of workers? 4. Miscellaneous Sr Para meters Yes No Remarks No. 1 Whether third party quality inspection is YES Agency, Bhopal being carried out on site during/after completion of the works? lf yes, provide details. 2 Whether anti-termite treatment has YES been undertaken for the soil? Whether fi re-fi ghting arrangements has I NO Not Required 3 been undertaken under supervision of fire consultant? 4. Whether proper signages have been YES installed on site/ completed building as per re uirement? 5. Whether precautions are undertaken to YES Water pumps when avoid air pollution during construction? required Please s ecify. 6 Whether records of all test reports / NO results have been properly kept in the prescribed formats and whether the same are available at site for viewing by allottees and to be handed over to the association of allottees? 7 Whether all relevant records including YES Once assciation is sanctioned building plans, utility formed all the drawings, various test reports / results relevant documents have been Properly kept in the will be Provided prescribed formats to be handed over to the association of allottees? No Not Required 8 Any innovative/ cost effective / green technology has been used for improving quali /e ne efficiency? Please s cify Agreed and A cc d u Bhara rngh Ehikaji Vagheta l/langalam _ a.E iCiwn Kogd with Govt of lndra i rlVO No DL/i 413t JT Mob No 9879s94469 Signat e of Partner Signature of Engineer Ritesh Suresh Lalwani Bharatsing bhikaii Vaghela Authorize Partner of DATE O3lOLl2O26 Mangalam lnfra