SANDIPR TOSHNIWAL Municipal LIC/Civil Engineer Municipal LIC No. LE/00001/2014-15 Annexure-B FORM-2 [SEE REGULATION 3] ENGINEER'S CERTIFICATE ITo Be Submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Project Wise) (Form Isued for the cost incurred till 31.03.2022(Q 4- FY. 2021-22) ate: 12/09/2023 angalam Infra, roject- Mangalam Park bop No. 27, Mansingka Building, amner Road, Pachora al :Pachora Dist : Jalgaon 424 201 ubject: Certificate of Cost Incurred for Development of "Mangalam Park" having MahaRERA Registration Number 9900025679 being developed by "Mangalam Infra" Sandip Ratanlal Toshniwal having PAN: AAGPT7729K have undertaken assignment of certifying Estimated Cost for AANGALAM PARK" having MahaRERA Registration Number- P49900025679 being developed by "Mangalam Infra" We have estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of intermal & external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the drawings/ plans made available to us for the project under reference by the Developer /Consultants. The Schedule of items and quantity required for the entire work as calculated by Quantity Surveyor* appointed by Developer/Engineer, the assumption of the cost of material. Labor and other inputs made by developer. and the site inspection carried out by us to ascertain / confirm the above analysis given to us. We estimate Total Estimated Cost of completion of the aforesaid project under reference at Rs 25,17,33,600/- (Total A And B) at the time of Registration. the estimated Total cost of project is with reterence to the Civil , MEP and Allied works required for completion of the apartments and proportionate COmpletion of internal & external works as per specifications mentioned in agreement of sale and for the Purpose of obtaining occupation certificate/completion certificatefor the building(s) Wing(s) / Layout Plotted Development from the "Municipal Corporation Pachora,424 201 being the Planning Authority Uhder Whose Jurisdiction the aforesaid project Is being implemented. Office: 61, GANESH COLONY, PACHORA, DIST : JALGAON 424 201 Mob: 88882-26226 SANDIPR TOSHNWAL Municipal LIC/Civil Enginesr Municipal LIC No. LE/00001/201445 Calculated at Rs. 6,06,95,355/- (Total of Table AAnd B) the 3. Estimated Cost Incurred till 31.03.2022 Is services used ard uit sost calculated on the basisinput materíals/ amount of Estimated Cost Incurred is these items. a of Completion of the Civil MEP And Alied Works for completion of the apartments 4. The Balance Cost of ie per specifications mentioncd in agreement proportionate completion of internal & external works as Table A and B) of the project is estimated at Rs, 19,10,38.245/- (Total of internal k allied Work for the apartments and proportionate D. Tcertity that the Cost of the Civil MEP and in agreement of sale of the aforesaíd Project as Complete S.NO external works, as per specifications mentioned on the date of this certificate is as given in Table Aand Bbelow. TABLEA .Profect:"Mangalam Park" Located at: S. No.107/2/B, Girna Buidirg /Wing /Layout /Plotted Development bearing Number Pumping Road, Pachora Dist: Jalgaon 424 201 Estate Project) (To be prepared separately for each Bullding /WIng /Layout/Plotted Development of the Real Particulars Amount (In Rs.) Sr.No 1 Total Estimated Cost of the Building /Wing Layout /Plotted Development as on date of Registration is 25,17,33,600/ 2 Cost incurred as on date of certificate 6,06,95,355/ Work done in Percentage 24.11% (as Percentage of the estimated cost) Balance Cost to be Incurred** (Based on Estimated Cost) Your 19,10,38,245/ Signa Sandi Local Cost Incurred on Additional /Extra Items NIL Muni not included in the Estimated Cost (Table-C) Agi Auth Date Office: 61, GANESH COLONY, PACHORA, DIST : JALGAON 424 201 Mob: 88882-26226 SANDIPR TOSHNIWAL Municipal LIC/CivilEngineer Municipal LIC No. LE/00001/2014-15 TABLE B (Internal & external Development Works in Respect of the Registered Phase) Amount (In Rs.) Sr.No Particulars NIL Total Estimated Cost Of the Internal and External Development Works Including amenities and Facilities In the layout as on date of Registration is Cost Incurred as on date of certificate NIL NIL Work done in percentage (as Percentage of the estimated Cost) Balance Cost to Be Incurred** (Based on Estimated Cost) NIL the NIL Extra Items not included in Cost incurred on Additional/ Estimated Cost (Table- C) -SAN Your Faithfully, NDIP R.TOSHNI Signature & Name Reg.No. LE/J0001 2014-15 Sandip RToshniwal Mun.Lic.En Local Authority Municipal LIC No. LE/00DOTZU14-15 Aame- Ritetalwani Infra" Authorised Partner of "Mangalam Date: 12/09/2023 PACHORA, DIST:JALGAON 424204 oce: 61, GANESH COLONY, Mob: 88882-26226 SANDIPR TOSHNIWAL Municipal LIC/Civil Engineer Municipal LIC No. LE/00001/2014-15 Note 1 Ihe scope of work is to Registered Real Estate Project as per drawings approved form time to time and as per specifications mentioned in agreement of sale. 2 Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantify calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by developer the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*) 3 (**)Balance Cost to be incurred (4) may vary from Difference between Total estimated Total estimated cost (1)and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 4 Allcomponents of work with specifications are indicative and not exhaustive. 5 Please specify if there are any deviations / qualifications Example: Any deviations in input material used from specifications in agreement of sale. Table -C List of Extra/ Additional /Deleted Items considered in cost (which were not part of the original Estimate of Total Cost) Sr. No List of Extra / Additional /Deleted Items Amount (In Rs) NIL NIL 2 NIL NIL office: 61, GANESHCOLONY, PAGHORA, DIST : JALGAON 424 201 Mob: 88882-26226