SANDIPR TOSHNIWAL Municipal LIC/Civil Engineer Municípal LIC No. LE/00001/2014-15 Annexure-B FORM-2 [SEE REGULATION 3)] ENGINEER'S CERTIFICATE (ToBe Submitted at the time of Registratlon of Ongolng Prolect and for withdrawal of Money trom Deignated Account Project Wise) (Form Issued for the cost incurred till 31.12,2021 (0-3- FY, 2021-22) ate: 12/09/2023 ), angalam lnfra, oject - Mangalam Park nop No. 27, Mansingka Building, mner Road, Pachora al :PachoralDist: Jalgaon 424 201 ubject: Certificate of Cost Incurred for Development of "Mangalam Park" havíng MahaRERA Regístratíon Nurnber 49900025679 being developed by "Mangalam Infra" Estimated Cost far Sandip Ratanlal Toshniwalhaving PAN:AAGPT7729K have undertaken assignment of certifying Infrz MANGALAM PARK" having MahaRERA Registration Number- P49900025679 being developed by "Mangalam We have estimated the cost of Civil, MEP and allied works required for completion of the apartrments and proportionate completion of internal & external works of the project as per specifications mentioned in available to us fo agreement of sale. Our estimated cost calculations are based on the drawings/ plans made the project under reference by the Developer /Consultants. The Schedule of items and quantity required for the entire work as calculated by Quantity Surveyor* appointed by Developer/Engineer. the assumption of the cost of material. Labor and other inputs made by developer. and the site inspection. carried out by us to ascertain / confirm the above analysis given to us. 2. We estimate Total Estimated Cost of completion of the aforesaid project under reference at Rs 25,17,33.600/- (Total A And B) at the time of Registration. the estimated Total cost of project is with reference to the Civil. MEP and Allied works required for completion of theagreement apartmentsofandsaleproportionate and for the completion of internal & external works as per specifications mentioned in purpose of obtaining occupation certificate/completion certificatefor the building(s) Wing(s) / Layout 201 being the Planning Authority plotted Development from the "Municipal Corporation Pachora,424 Under Whose Jurisdiction the aforesaid project Is being implemented. JALGAON 424 201 Office: 61, GANESH COLONY, PACHORA, DIST : Mob: 88882-26226 SANDIPR TOSHNIWAL Municipal LIC/Civil Engineer Municipal LIC No. LEJ00001/2014-15 3. Estimated Cost Incurred till 31.12.2021 Is Calculated at Rs. 4,22,97,518/- (Total of Table A And B) T amount of Estimated Cost Incurred is calculated on the basis input materials / services used and unit coese these items. 4. The Balance Cost of Completion of the Civil MEP and Allied Works for completion of the apartments an proportionate completion of internal &external works as per specifications mentioned in agreement of saie of the project is estimated at Rs. 20,94,36,082/- (Total of Table A and B) 5. Icertify that the Cost of the Civil MEP and allied Work for the apartments and proportionate internal &sr. external works, as per specifications mentioned in agreement of sale of the aforesaid on the date of this certificate is as given in Project as Complete Table A and Bbelow. TABLEA Building Wing/ Layout/ Plotted Development bearing Number Pumping Road, Pachora Dist: Jalgaon 424 201 .Project:Mangalam Park" Located at: S. No.l107/2B, Gine (To be prepared separately for each Building /Wing / Layout / Plotted Development of the Real Estate Project) 3 Sr.No Particulars Amount (In Rs.) 1 Total Estimated Cost of the Building Wing Layout /Plotted Development as on date of Registration is 25,17,33,600/ 2 Cost incurred as on date of certificate 4,22,97,518/ Work done in Percentage 16.80 % (as Percentage of the estimated cost) 4 Balance Cost to be Incurred** four (Based on Estimated Cost) Signa 20,94,36,082/ Sand Ocal 5 Cost Incurred on Additional /Extra Items Mun NIL not included in the Estimated Cost (Table-C) Agre Ma Auth Date Office: 61, GANESH COLONY, PACHORA, DIST : JALGAON 424 201 Mob: 88882-26226 SANDIPR TOSHNIWAL Munlcipal LIC/Civil Engineer Munlclpal LIC No. LE/00001/2014-16 TABLE B (Internal &external Development Works In Respect of the Reglstered Phase) Amount (In Rs.) r.No Particulars NIL Total Estimated Cost Of the Internal and External Development Works Including amenltles and Faclltles In the layout as on date of Registratlon is Cost Incurred as on date of certlflcate NIL NIL Work done in percentage (as Percentage of the estimated Cost) Balance Cost to Be Incurred** (Based on Estimated Cost) NIL NIL Items not Included In the Cost incurred on Additional/ Extra Estimated Cost (Table- C) ur Faithfuly, 1.No. . F 0 0 6 0 1 gnature & Name 2 0 1 4 - 1 5 un.i ndip Ràtanlal Toshniwal cal Authority unicipal LICNo. LE/O0001/2014-15 ingGAAte/by: ame RitesWesh Lalwani uthorisePartner of "Mangalam Infra" ate: 129/2023 JALGAON 424 201 oflce: 61,GANESH COLONY, PACHORA, DIST: Mob: 88882-26226 SANDIPR TOSHNIWAL Municipal LIC/Civil Engineer Municipal LIC No. LE/00001/2014-4É Note (To 1 The scope of work is to Registered Real Estate Project as per drawings approved form time to time and as per specifications mentioned in agreement of sale. ite: 2 Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantify calculated can be relied upon by the Engineer. In case ofang independent quantity surveyor being appointed by developer the name has to be mentioned at the place rojed marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the mne op office of Engineer, who is responsible for the quantity calculated should be mentioned at the place al :P marked (*) ubje 3 (**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Total estimated 4990 cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost any deviation in quantity required for development of the Real Estate Project ir, will result in amendment ofthe cost incurred /to be incurred. San 4 Allcomponents of work with specifications are indicative and not exhaustive. MA 5 Please specify if there are any deviations / qualifications Example: Any deviations in input material used from specifications in agreement of sale. Table -c List of Extra/Additional /Deleted Items considered in cost (which were not part of the original Estimate of Total Cost) Sr. No List of Extra/Additional /Deleted Items Amount (In Rs) 2. NIL NIL 2 NIL NIL Ofice: 61,GANESH COLONY, PACHORA, DIST JALGAON 424 201 Mob: 88882-26226