SANDIPR TOSHNIWAL Municipal LIC/CivilEngineer Municipal LIC No. LE/00001/2014-15 Annexure-B FORM-2 (SEE REGULATION 31 ENGINEER'S CERTIFICATE Project Wie) Project and for withdrawal of Money from Designated Account and (To Be Submitted at the time of Registration of Ongoing (0-2- FY, 2021-22) (Form Issued for the cost incurred till 30.09,2021 Date: 12/09/2023 tity TO, of Mangalam Infra, lace Project - Mangalam Park the Shop No. 27, Mansingka Building, lace Jamner Road, Pachora Tal :PachoraDist :Jalgaon 424 201 Number Park" having MahaRERA Registration nated Subject: Certificate of Cost Incurred for Development of "Mangalam c. As P49900025679 beingdeveloped by "Mangalam Infra" roject Sir, certifying Estimated Cost for Sandip Ratanlal Toshniwalhaving PAN:AAGPT7729K have undertaken assignment of I Mangalam Infra" Number- P49900025679 being developed by "MANGALAM PARK" having MahaRERA Registratíon naterial apartments and and allied works required for completion of the mentioned in 1. We have estimated the cost of Civil, MEP works of the project as per specifications proportionate completion of internal & external based on the drawings/ plans made available to us for Our estimated cost calculations are agreement of sale. required for under reference by the Developer /Consultants. The Schedule of items and quantity the project the the entire work as calculated by Quantity Surveyor* appointed by Developer/Engineer. inspection inputs made by developer. and the site assumption of the cost of material. Labor and other given to us. above analysis carried out by us to ascertain / confirm the at Rs estimate Total Estimated Cost of completion of the aforesaid project under reference 2. We (Total A And B) at the time of Registration. the estimated Total cost of project is with 25,17,33,600/- for completion of the apartments and proportionate reference to the Civil , MEP and Allied works required specifications mentioned in agreement of sale and for the completion of internal & external works as per certificatefor the building(s) Wing(s) / Layout purpose of obtaining occupation certificate/completion Pachora,424 201 being the Planning Authority Corporation plotted Development from the "Municipal implemented. Under Whose Jurisdiction the aforesaid project Is being JALGAON 424 201 Office: 61, GANESH COLONY, PACHORA, DIST: Mob: 88882-26226 SANDIPR TOSHNIWAL Municipal LIC/Civil Engineer Municipal LIC No. LE/00001/2014-15 3. Estimated Cost Incurred till 30.09.2021 Is Calculated at Rs. 3,56,70,411/- (Total of Table AAnd B) The amount of Estimated Cost Incurred is calculated on the basis input materials / services used and unit cost of these items. 4. The Balance Cost of Completion of the Civil MEP and Alied Works for completion of the apartments and proportionate completion of internal &external works as per specifications mentioned in agreement of sale. of the project is estimated at Rs. 21,60,63, 189/- (Total of Table Aand B) 5. Icertify that the Cost of the Civil MEP and allied Work for the apartments and proportionate internal & external works, as per specifications mentioned in agreement of sale of the aforesaid Project as Completed ir. No on the date of this certificate is as given in Table A andB below. TABLEA Building /Wing / Layout / Plotted Development bearing Number Project:Mangalam Park" Located at: S. No. 10712/B Girna Pumping Road, PachoraDist: Jalgaon 424 201 (To be prepared separately for each Building /Wing / Layout / Plotted Development of the Real Estate Project) Sr.No Particulars Amount (In Rs.) 1 Total Estimated Cost of the Building /Wing Layout/Plotted Development as on date of Registration is 25,17,33,600/ Cost incurred as on date of certificate 3,56,70,411/ 3 Work done in Percentage 14.17 % (as Percentage of the estimated cost) 4 Balance Cost to be Incurred** Your F (Based on Estimated Cost) Signat 21,60,63,189/ Sandi Local Munid Cost Incurred on Additional /Extra Items NIL not included in the Estimated Cost (Table-C) Agree Nam Auth Date Ofice: 61, GANESH COLONY, PACHORA, DIST : JALGAON 424 201 Mob: 88882-26226 AL SANDIPR TOSHNIWAL Municipal LIC/Civil Engineer 16 Municipal LIC No. LE/00001/2014-15 The And sale, TABLE B (internal &external Development Works in Respect of the Registered Phase) |& Amount (In Rs.) BledSr.No Particulars NIL Total Estimated Cost Of the Internal and External Development Works Including amenities and Facilities In the layout as on date of Registration is Cost Incurred as ondate of certificate NIL Work done in percentage (as Percentage of the estimated Cost) NIL Balance Cost to Be Incurred$* (Based on Estimated Cost) NIL Cost incurred on Additional/ Extra Items not included in the NIL Estimated Cost (Table- C) Your Faithfully, Signature & Name Reg.No. LE/00001 2014-15 Sandip Ratanlal Toshni MunLice Local Authority Municipal LIC No. LE/00001/2014-15 Agreed and AccepteMangalamnfra Name: Ritesh Suresh Lalwaniphrtngr Authorised Partner of "MangaamInfra" Date: 12/09/2023 office: 61, GANESH COLONY, PACHORA, DIST : JALGAON 424 201 Mob: 88882-26226 SANDIPR TOSHNIWA! Municipal LIC/Civil Enginee Municipal LIC No. LE/00001/2014-45 Note (To Be S 1 The scope of work is to Registered Real Estate Project as per drawings approved form time to time and as per specifications mentioned in agreement of sale. ate: 12/ 2 Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantify calculated can be relied upon by the Engineer. In case of angaa independent quantity surveyor being appointed by developer the name has to be mentioned at the place roject - marked (") and in case quantity are being calculated by office of Engineer, the name of the person in the hop No office of Engineer, who is responsible for the quantity calculated should be mentioned at the place mner R marked (*) al :Pact 3 (**) Balance Cost to be incurred (4) may vary from Difference between Total ubject: estimated Total estimated 4990002 cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost any deviation in quantity required for development of the Real will result in amendment of the cost incurred / to be incurred. Estate Project 4 Allcomponents of work with specifications are indicative and not exhaustive. Sandip MANG 5 Please specify if there are any deviations /qualifications Example: Any deviations in input material used from specifications in agreement of sale. We Table -c pro agr List of Extra/Additional /Deleted Items considered in cost the the (which were not part of the original Estimate of Total Cost) ass car Sr. No List of Extra / Additional /Deleted Items Amount (In Rs) We NIL NIL 25, ref NIL NIL Cor pur plo Un Office: 61, GANESH COLONY, PACHORA, DIST: JALGAON 424 201 Mob: 88882-26226