Annexure A FORM 1 ARCHITECTS CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date : 31/03/2023 To, Mangalam Infra Mansughka Bldg, Jamner Road Pachora, Jalgaon - 424201 Subject : Certificate of Percentage of Completion of Construction Work of “Mangalam Park” having MahaRERA Registration Number P49900025679 being developed by Mangalam Infra, Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on of the date of this certificate, the Percentage of Work done for Real Estate Project as registered vide Number P49900025679 under MahaRERA is as per “Table - A” herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Sr. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) 1 Excavation 100% 2 Basements (if any) -- 3 Podiums (if any) -- 4 Plinth 100% 5 Stilt Floor -- 6 Slabs of Super Structure 65% 7 Internal walls, Internal Plaster, Floorings within 40% Flats/Premises, Doors and Windows to each of the Flat/Premises 8 Sanitary Fittings within the Flat/Premises 25% 9 Staircases, Lifts Wells and Lobbies at each Floor 35% level connecting Staircases and Lifts, Overhead and Underground Water Tanks 10 External plumbing and external plaster, \ 15% Elevation, completion of terraces with water proofing of the Building/Wing. Office: 602-B, 11 Sarvoday, Kher Nagar, Bandra (East), Mumbai – 400051. | Tel: +91 22 2647 7036 11 Installation of lifts, water pumps, Fire Fighting -- Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment/CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other Activities. TABLE-B Common Areas (Internal & External Development Works) in Respect of the entire Registered Phase / Project Number Sr. Common areas Proposed Percentage of Details No And Facilities, Amenities (Yes/No) Work done 1. Internal Roads & Footpaths Yes 0% 2. Water Supply Yes 0% 3. Sewerage (chamber, lines, Septic Yes 0% Tank, STP) 4. Storm Water Drains Yes 0% 5. Landscaping &Tree Planting Yes 0% 6. Street Lighting Yes 10% 7. Community Buildings Yes 0% 8. Treatment and disposal of sewage No 0% and sullage water 9. Solid Waste management& Disposal No 0% 10. Water conservation, Rain water Yes 0% harvesting 11. Energy Management No 0% 12. Fire Protection and Fire Safety No 0% Requirements 13. Electrical meter room, sub-station, Yes 0% receiving station 14. Others (Option to Add more) No 0% Yours Faithfully For UB Architects, Digitally signed by UJWAL SATISH BHOLE UJWAL DN: C=IN, O=U B ARCHITECTS, OU=PARTNER, Phone=4c419438fd1b70f4e30bba786f07a717e4be e42297ed007baf7f334e3730efa7, PostalCode=400051, S=MAHARASHTRA, SATISH SERIALNUMBER=87ef8ef6514575b6a0b114c0354 3929a54507a3d00a90897d4f6350dd78880ee, CN=UJWAL SATISH BHOLE Reason: I am the author of this document BHOLE Location: your signing location here Date: 2023.10.17 17:20:54-07'00' Foxit PDF Reader Version: 11.0.1 Ar. Ujwal Bhole (License NO. CA/2010/47919) Agreed and accepted by: Signature of Promoter Name: Mangalam Infra. Office: 602-B, 11 Sarvoday, Kher Nagar, Bandra (East), Mumbai – 400051. | Tel: +91 22 2647 7036