ID ED uborchitects Annexure A FORM I ARC H ITECTS CERTI FICATE (To be submitted of the time of Registrotion of Ongoing Project ond for withdrowol of Money from Designoted Account) Dote : 3l/12/2022 To, Mongolom lnfro Monsughko Bldg, Jomner Rood Pochoro, Jolgoon - 424201 Subject : Certificoie of Percentoge of Completion of Construction Work of "Mongolom Pork" hoving MohoRERA Registrotion Number P49900025679 being developed by Mongolom lnfro, Bosed on Site lnspection, with respect to eoch of the Building/Wing of the oforesoid Reol Estote Project, I certify thot os on of the dote of this certificote, the Percentoge of Work done for Reol Esiote Project os registered vide Number P4990002567? under MohoRERA is os per "Toble - A" herein below. The percentoge of the work executed with respect to eoch of the octivity of the entire phose is detoiled in Toble B. Toble A Sr. Tosks / Activity Percentoge of Aciuol Work No. Done (As on dqle of the Certificole) I Excovotion 100% 2 Bosements (if ony) Podiums Iif onv) 4 Plinth 100% 5 Stilt Floor 6 Slobs of Super Structure s5% 7 lnternol wolls, lniernol Ploster, Floorings within 30% Flots/Premises, Doors ond Windows to eoch of the Flqt/Premises .8 Soniiory Fittings within the Flot/Premises 10% I Stoircoses, Lifts Wells ond Lobbies of eoch Floor 30% level connecting Sioircoses ond Lifts, Overheod ond Underoround Woter Tonks l0 Externol plumbing ond externol ploster, \ 15% Elevotion, completion of terroces with woter proofing of the Building/Wing. € Olllcc: 6O2-1, ll Sorvodoy, Kher Nogor. Bondro (Eost), Mumboi - 40OO5l. I lnlouborch@gmoll.com I lcl: +91 22 2617 7036 il lnstollotion of lifts, woter pumps, Fire Fighting Fitlings ond Equipment os per CFO NOC, Electricol fittings, mechonicol equipment, Complionce to conditions of environment/CRZ NOC, finishing to entronce lobby/s, plinth protection, poving of oreos oppurtenont to Building/Wing, Compound Woll ond oll other requirements os moy be required to complete project os per specificotions in ogreement of Sole. Any other Activities. TABtE.B Common Areos (lnternol & Exlernol Development Works) in Respecl of the enlire Registered Phose / Project Number Sr. Common oreos Proposed Percentoge of Detoils No And Focilities, Amenities (Yes/No) Work done I lnternol Roods & Footpoths Yes 0% 2. Woter Supply Yes 0% ? Seweroge (chomber, lines, Septic Yes 0% Tonk, STP) 4. Storm Woier Droins Yes o% ( Londscoping &Tree Plonting Yes 0% 6. Street Lighting Yes 10% 7. Community Buildings Yes o% 8. Treotment ond disposol of sewoge No 0% ond sulloge woter 9. Solid Woste monogement& Disposol No 0% 10. Woter conservotion, Roin woter Yes 0% horvesiing il Energy Monogement No 0% 12. Fire Protection ond Fire Sofety No o% Reouirements 13" Electricol meter room, sub-stotion, Yes 0% receiving stotion 14. Others (Option to Addmore) No 0% 7Z-..txtv- 8o\ .// Yours Froilhfully (, 4 For UB Architects, !\l a 7 o \ \or +r:9Z Ar" Ujwol Bhole (license NO. CAl2010/ 47?19) Agreed ond occepted by: Signoture of Promoter Nome: Mongolom !nfro.