FORM2 ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of ongoing Project and for withdrawal of Money from Designated Account- Date: 08-03-2021 To SAI SHIV CONSTRUCTION 56 Shiwam Nagar M.J College Raod, Jalgaon Subject: certificate of cost Incurred for Development of (Shree Sai Sona plaza) for construction of Sai plaza building(s)-0-Wing(s) of the 0 phase (MahaRERA Registration Number) situated on the plot bearing /S No.448/l/l plot No.l6 of Division Mehrun Tal/Dist Jalgaon pIN 425001 developed by sAI SHIV coNSTRUcrIoN Demarcated by its boundaries (latitude and longitude ofthe end points) PLOT No 15 to the North 30 FT WIDE ROAD to the South 30 FT WIDE ROAD to the East pLoT No 3l & 32 to the west of Division Mehrun village JALGAON taluka JALGAON District JALGAON PIN 425001 admeasuring 357 02 sq mts. area being developed by (Promoter) Ref: MahaRERA Registration Number p 49900022150 Sir. I/we HEMANT JAGNNATH NYATI have undertaken assignment of certifuing Estimated Cost for the Real Estate project proposed to be registered under MahaRERA, being SAI PLAZA Building(s)/ 0 wing(s) of the 0 phase situated on the plot bearing cN. No/cTS No./Survey no./Final Plot no.448/1/l Plot No. 16 of Division'MEHRUN village MEHRUN taluka JALGAON District JALGAoN pIN 425001 admeasuring 357 02 sq mts. area being developed by 1. Following technicar professionals are appointed by owner/promoter:- (as applicable) (i) M/s /Shri/Smt.HEMANT JAGNNATH NyATI as Architect/Engineei (ii) M/s./Shri/Smt ANAND AMOL MUKTIND as Structural Consultant (iii) M/s /Shri/Sml as MEP Consultant (iv) M/s /Shri/Smt.NITIN PRAKASH pAWAR as Site Supervisor 2 We have estimated the cost of the completion to obtain occupation ce(ificate/completion certificate, of the cr'vil, MEp and Allied works, ofthe Building(s) ofthe project. Our estimated cost calculations are basel on the Drawing/plans made available to us for the project under reference by the Developer and Consultants and the Schedule ofitems and quantity for the entire work as calculated by quantity Suweyor appointed by Developer/Engineer and the site inspection carried out by us. 3 we estimate Total Estimated cost of completion of the building(s) of the aforesaid project under reference as Rs.1,30,00,000/- (Total of Table A and B). The estimated Total cost of Project is with reference to the civil, MEp and allied works required to be completed for the purpose ofobtaining occupation certificate/completion certificate for the building(s) from the being the Planning Authority under whosejurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at (Total of Table A and B) The amount of Estimated Cost Incurred is calculated on the base ofamount ofTotal Estimated Cost. 5 The Balance cost of completion of the civil, MEP and Allied works of the Building(s) of the subject project to obtain occupation Certificate/Completion Certificate from (planning Authority) Rs. is estimated at (Total ofTableA and B). 6' I certiry that the cost ofthe civil, MEP and allied work for the aforesaid project as completed on the date ofthis certificate is as given in Table A and B below: Table - A BuildingMing bearing Number or called (to be prepared separately for each Building/'Wing ofthe Real Estate Project) Amount Sr. No Particulars (in Rs.) Total Estimated Cost of the buildine l 3000000.0c 2 Cost incurred as on 3l/12/2020 172'73500.0C j Work done in Percentase (as Percentase ofthe estimated cost) 13301 A Balance Cost to be Incurred (Based on Estimated Cost) -4273s00 0c Cost Incurred on Additional/Extra Items as on not included in the Estimated Cos 5 (Table{) Table - B (to be prepared for the entire registered phase ofthe Real Estate Project) Amount Sr. No Common areas and Facilities Amenities (in Rs.) Total Estimated Cost of the Intemal and Extemal Development Works including amenities ant Facilities in the layout as on date ofReeistration is 2 Cost incurred as on J Work done in Percentage (as Percentage ofthe estimated cost) #DIV/O! 4 Balance Cost to be Incurred (Based on Estimated Cost) 00c Cost Incurred on Additional/Extra Items as on not included in the Estimated Cos 5 (Table{) Yours Faithfully, were not Dart ofthe Bstlmate of I otal Sr. No. Items Cost 2