FORM2 ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of ongoing Project and for withdrawal of Money from Designated Account - Date: 03-07-2020 To SAI SHIV CONSTRUCTION 56 Shiwam Nagar M J.College Raod, Jalgaon Subject: certificate of Cost Incurred for Development of (Shree Sai Sona plaza) fbr construction of Sai plaza building(s)-0-Wing(s) of the 0 phase (MahaRERA Registration Number) situated on the plot plot bearing /S No.448/l/1 No.16 of Division Mehrun Tal/Dist Jalgaon pIN 425001 developed by SAr SHIV coNSTRUcrIoN Demarcated by its boundaries (latitude and longitude ofthe end points) PLOT NO 15 to the North 30 FT WIDE ROAD to the South 30 FT WIDE ROAD to the East pLOT NO 3t & 32 to the West of Division Mehrun village JALGAON taluka JALGAON District JALGAON PIN 425001 admeasuring 357 02 sq mts area being developed by (Promoter) Ref: MahaRERA Registration Number p 49900022150 Sir, the Real Estate project ase situated on the plot llage MEHRUN taluka I (i) M/s /Shri/Smt HEMANT JAGNNATH NyATI as Architect/Engineer (ii) M/s./Shri/Smt ANAND AMOL MIJKUND as Structural Consultant (iii) M/s /Shri/Smt as MEP Consultant (iv) M/s./Shri/Smt NITIN PRAKASH pAWAR as Site Supervisor 2' we have estimated the cost of the completion to obtain occupation certificate/completion Certificate, of the civil, MEp and Allied works, ofthe Building(s) ofthe project. our estimated cost calculations are basei on the Drawing/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by quantity Suweyor appointed by Developer/Engineer and the site inspection carried out by us 3' we estimate Total Estimated cost ofcompletion ofthe building(s) ofthe aforesaid project -civil, under reference as Rs.1,30,00,0001 (Total of table A and B). The estimated rotal cost of Project is with reference to tne rrEp ;;il; ;;*rlrir.o . u" completed for the purpose ofobtaining occupation certificate/completion certificate for the building(s) from the being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4 The Estimated Cost Incurred till date is calculated at (Total of Table A and B) The amount of Estimated Cost Incurred is calculated on the base ofamount ofTotal Estirn.ateO Cost. 5. The Balance Cost of Completion of the Civit, MEp and Allied works of the Building(s) of the subject projoct to obtain Occupation Certificate/Completion Certificate from - (Planning Authority) is estimated at Rs. (Totat ofTableAand B). 6' I certi! that the cost ofthe civil, MEP and allied work for the aforesaid Project as completed on the date ofthis certificate rs as given in Table A and B belowl Table - A BuildingAMing bearing Number or called (to be prepared separately for each BuildingAVing ofthe Real Estate Project) Amount Sr. No Particulars (in Rs.) fotal Estimated Cost of the buildine 13000000.0( 2 lost incurred as on30/06/2020 l 1344182.0( 3 y'y'ork done in Percentase (as Percentage ofthe estimated cost) 8701 4 ]alance Cost to be Incurred (Based on Estimated Cost) 1655818 0( lost Incurred on Additional/Extra Items as on not included in the Estimated Cos 5 Tabte{) Table - B (to be prepared for the entire registered phase ofthe Real Estate Project) Amount Sr. No Common areas and Facilities Amenities (in Rs-\ Total Estimated Cost of the Intemal and Extemal Development Works includins amenities and I Facilities in the lavout as on date ofResistration is 2 lost incurred as on J Work done in Percentase (as Percentage ofthe estimated cost) #DIV/O! ^ Balance Cost to be Incurred (Based on Estimated Cost) 000 lost Incurred on Additional/Extra Items as on not included in the Estimated Cost 5 'Tahle {) ttHlrd;tNn .r ' Ft tz ..\Tt Yours Faithfully, Jalgaon City MuniciPal Corpor;t,on E'NGINEER L.No.l5 T.FCLATJ PFTH..I I I. G AC1J t,,ict.Yrll? 7)3't'u Table - C List of Extra/Additional Items executed with Cost were not oart ofthe Estimate of Total Sr. No. Items Cost I 2