FORM 2 ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of ongoing Project and for withdrawal of Money from Designated Account - Date: 04-10-2019 To SAI SHIV CONSTRUCTION 56 Shivram Nagar M J College Raod, Jalgaon cost Incurred Sona Plaza) for Constmction of Sai plaza fthe 0 phase (M ated on the Plot bearing /S No.44gl1/1 plot No.16 ist Jalgaon pIN 4 STRUCTION Demarcated by its boundaries (latitude and longitude ofthe end points) PLOT NO 15 to the North 30 FT WIDE ROAD to the South 30 FT WIDE ROAD to the East pLOT NO 3t & 32 to the West of Division Mehrun village JALGAON taluka JALGAON District JALGAON PIN 425001 admeasuring 357 02 sqmts area berns developed by (Promoter) MahaRERA Registration Number p 49900022150 Sir, undertaken assignment of certifuing Estimated cost for the Rear Estate project , being SAI pLAZA Buitding(s)/ 0 Wing(s) of the 0 phase situated on the ptot Plot no.448/l/1 prot No. 16 of Division MEHRLTN viilage MEHRUN JALGAoN District JALGAON pIN 425001 admeasuring 357.02 sq.mts. area taluka being developed by 1. Following technical professionars are appointed by owner/promoter:- (as applicabte) (i) M/s./Shri/Smt HEMANT JAGNNATH NYATI as Architect/Engineei (ii) M/s /Shri/Smt ANAND AMOL MUKTJND as Structural consultant (iii) M/s /Shri/Smt as MEP Consultant (iv) M/s./Shri/Smt.NITIN PRAKASH pAWAR as Site Supervisor 2 we have estimated the cost of the completion to obtain occupation certificate/Completion Certificate, of the civil, MEp and Allied works, of the Building(s) of the project. our estimated cost calculations are based on the Drawing,/plans made avarlable to us for the project under reference by the Developer and consultants and the Schedule of items and quantity for the entire work as calculated by quantity Surveyor appointed by Developer/Engineer and the site inspection carried out by us ofthe aforesaid proj .1,30,00,000/- reference to the Civ requrred to be on certificate for the id project is being implemented 4' The Estimated cost Incurred till date is calculated at (Totat of rable A and B) The amount of Estimated cost Incurred is calculated on the base ofamount ofTotal Estimated Cost. 5 The Balance cost of completion of the civil, MEP and Allied works of the Building(s) of the subject project to obtain occupation certificate/completion certificate from (planning Authority) is estimated Rs. at (Toral ofTable A and B). 6 I certifr that the cost ofthe civil' MEP and allied work for the aforesaid project as completed on the date ofthis certificate is as given in Table A and B below: Table - A Building,AVing bearing Number or called (to be prepared separately for each BuildingMing of the Real Estate project) Sr. No Particulars Amount (in Rs.) I Iotal Estimated Cost of the buildins r3000000 00 2 lost incurred as on 30/09/2O19 4335000.00 J Work done in Percentage (as Percentage ofthe estimated cost) 33% 4 Balance Cost to be Incuned (Based on Estimated Cost) 866s000 00 lost Incurred on Additional/Extra Items as on _ not included in the Estimated cosl 5 'Table{) Table - B (to be prepared for the entire registered phase ofthe Real Estate project) Sr. No Common areas and Facilities Amenities Amount (in Rs.) Total Estimated Cost of the Intemal and Extemal Development Works including amenities and Facilities in the layout as on date ofResistration is 2 Cost incurred as on 3 Work done in Percentage (as Percentage ofthe estimated cost) #DIV/O! 4 Balance Cost to be Incurred (Based on Estimated Cost) 000 cost Incurred on Additional/Extra Items as on not included in the Estimated cosl 5 iTable{) Which were not part ot the Estimate of Total Sr. No. Items Cost 2