FORM 1 ARCHITECT'S CERTIFICATE To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Accoutrt) Date: 12-10-2020 To The SAI SHIV CONSTRUCTION 56,SHI\'RAM NAGAR MJ COLLAGE ROAD, JALGAON Subject: Certificate of Percentage of Completion of Construction Work of " Sai Plaza", 0lNo. of Building(s) 0l-Wing(s) of the of the Project ( RERA Registration Number P 49900022150) situated on the Plot bearing S No 448/1/1 Plot No 16 demarcated -N//A-Phase by its boundaries (latitude and longitude of the end points) PLOT NO 15 to the North ,30 FT WIDE ROAD the South ,30 FT WIDE ROAD to the East, PLOT NO 3l & 32totheWestofDivision MEHRUNvillageMEHRUNtalukaJALGAONDistrict-JALGAON,PIN42500l,admeasuring35T02sqmts.areabeing developed by (Promoter's Name) Sir, ywe Anand Amol Mukund have undertaken assignment as Arcbitect/Engineer of certiling Percentage of Completion of Construction Work of " Sai Plaza" the Building(s)/_0 Wing(s) of the _0 Phase of the Project, situated on the plot bearing S No.448/l/l Plot No 16 , of Division MEHRUN viltage MEHRUN taluka JALGAON District - JALGAON, PIN 425001, admeasuring 357 02 sq mts area being developed by SAI SHIV CONSTRUCTION as per the approved plan 1 Following technical professionals are appointed by Owner/Promoter:- (as applicable) (i) Shri Anand Amol Mukund as Architect/Engineer (ii) Shri Anand Amol Mukund as Structural Consultant (iii) IWs /Shri/Smt as MEP Consultant (iv) Shri NITIN PRAKASH PAWAR AS SitE SUPETVISOT Based on Site Inspection, with respect to each ofthe BuildingAVing ofthe aforesaid Real Estate Project, I certifl that as on the date ofthis certificate, the Percentage ofWork done for each ofthe buildingAVing ofthe Real Estate Project as registered vide number under GujRERA is as per table A herein below The percentage ofthe work executed with respect to each ofthe activity ofthe entire phase js detailed in Table A and B Table - A Building " Sai Plaza" Percentage ofwork Sr. No Tasks/Activity done I ixcavation 009 2 Basement(s) and Plinth 0001 3 iround Floor 0001 4 First Floor 0001 5 number ofSlabs ofSuoer Structure 0001 6 Intemal walls, Intenill Piaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/PremisEl 10001 7 Sanitarv Fiftinss within the Flat/Premises 10001 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and 8 Underground Water Tanks 80o/o The external plumbing and external plaster, elevation, completion ofterraces with waterproofing ofthe 9 BuildingAVing l00o/o Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, compliance to conditions of environmenVCM NOC, Finishing tc l0 entrance lobby/s, plinth protection, paving ofareas appurtenant to BuildingAVing, Compound Wall and all other requirements as may be required to Obtain Occupation/Completion Cedftcate 9001 Table - B Intemal & External Development Works in Respect of the entire Registered Phase Proposed Percentage of Sr. No Common areas and Facilities Amenities (Yes/1.{o) Remarks work done Intemal Roads & Footoaths \{o \I/A 2 Water Suoolv Yes 10001 5 Seweraee (chamber. lines. SeDtic Tank. STP) Yes t0001 ^ Storm Water Drains {o 10001 5 Landscaoine & Tree Planting {o {/A 6 Street Lishtins \Io {/A 7 v Rrrildinqs \io {/A 8 Treatment and disposal ofsewase and sullase water /STP {o {/A 9 Solid Waste Manasement & Disoosal :.Io {/A t0 Water Conservation. Rain Water Harvesting . Percolating WelyPit Yes loool t1 Energv Management \,lO {/A t2 Fire Protection and Fire Safetv Reouirements {o {/A t3 Electrical Meter Room. f,ub-station. Receivins Station {o ool t4 Jthers (Ootion to Add mb\e) {o ool Yours Faithfully, MR.ANANDAMOLMUKL]ND Signature & Name (IN BLOCK LETTERS) OF Architect/Engineer (License No.2l.) ANAND A.]TIUKUND \