FORM 1 ARCHITECT'S CERTIFICATE To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 03-07-2020 To The SAI SHIV CONSTRUCTION 56,SHIVRAM NAGAR MJ COLLAGE ROAD. JALGAON Subject: Certificate of Percentage of Completion of Construction Work of " Sai Plaza", 01No. of Building(s) Ol_Wing(s) of the _N//A_phase of the Project ( RERA Registration Number P 49900022150) situated on the Plot bearing S No. 448/l/l Plot No. 16 demarcated by its boundaries (latitude and longitude of the end points) PLOT NO. 15 to the North ,30 FT WIDE ROAD the South ,30 FT WIDE ROAD to the East, PLOT NO 31 & 32 to the West of Division MEHRUN village MEHRUN taluka JALGAON District - JALGAON, PIN 425001, admeaswing 357 02 sq mts. area being developed by (Promoter's Name) Sir, VWe Anand Amol Mukund have uirdertaken assignment as Architect/Engineer of certiling Percent4ge of Completion of Construction Work of " Sai PIMA" the Building(s/-0-[ing(s) of the _0________Phase of the Project, situated on the plot bearing S No.448/1/l Plot No.l6 , of Division MEHRUN village MEHRUN taluka JALGAON District - JALGAON, PIN 425001, admeasuring 357 02 sq.mts area being developed by SAI SHIV CONSTRUCTION as per the approved plan l. Following technical professionats are appointed Uy Ownernrtnoter:- (as applicable) (i) Shri Anand Amol Mukund as Architect/Engineer (ii) Shri Anand Amol Mukund as Structural Consultant (iii) M/s /Shri/Smt. as MEP Consultant (iv) Shri NITIN PRAKASH PAWAR as Site Supervisor Based on Site Inspection, with respect to each ofthe BuildingAVing ofthe aforesaid Real Estate Project, I certily that as on the date ofthis certificate, the Percentage ofWork done for each ofthe buildingAMing ofthe Real Estate Project as registered vide number under GuiRERA is as per table A herein below. The percentage ofthe work executed with respect to each ofthe activity ofthe entire phase is detailed in Table A and B. Table - A Building " tut ttu"u" Percentage ofwork Sr, No Tasks/Activity done Excavation 100% 2 Basement(s) and Plinth 100% 3 Sround Floor 10001 4 lirst Floor too% 5 5 number ofSlabs ofSuoer Structure 100% 6 Iternal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 10004 7 ianitary Fittings within the Flat/Premises 7001 Staircases, Lifu Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and 8 Underground Water Tanks 50o/o The extemal plumbing and extemal plaster; elevation, completion oftenaces with waterproofing ofthe 9 BuildingAVing 10001 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, compliance to conditions of environmenUCRZ NOC, Finishing tr t0 entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation/Completion Certificate 2001 Table - B Intemal & Extemal Development Works in Respect ofthe entire Registered Phase Proposed Percentage of Sr. No Common areas and Facilities Amenities Remarks (Yes/|.{o) work done Intemal Roads & Footoaths {o {/A 2 Water Suonlv Yes loool J Sewerase (chamber. lines. Seotic Tank. STP) Yes 10001 Storm Water Drains vo lOOo/a 5 -andscapine & Tree Planting NO {/A 6 Itreet Liehtine NO {/A lommuniw Buildinss No {/A 8 lreatment and disposal ofsewage and sullage water /STP No \T/A 9 Jolid Waste Manaeement & Disoosal No {/A 0 iy'ater Consewation. Rain Water Harvesting . Percolating WelyPit Yes 10001 inergv Managemenl No \/A 2 lire Protection and Fire Safetv Requirements No N/A J llectrical Meter Roonl\Sub-station. Receivins Stalion No o% 4 )thers (QDtion to AddHore) No o% Yours Fai rhfully, MR ANAND AMOI, MIIKIINT) Signature & Name (IN BLOCK LETTERS) OF Architect/Engineer (License No 21 ) ANAND A.MUKUNff M.E.(Structure'8) I