FORM T ARCHITECT'S CERTIFICATE To be submitted at tbe time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 20-04-2020 To The SAI SHIV CONSTRUCTION 56,SHIVRAM NAGAR I\4J COLLAGE ROAD, JALGAON Subject: CertificateofPercentageofCompletionofConstructionWorkof" Sai Plaza",OlNo ofBuilding(s) 0l_Wing(s)ofthe_N//A_Phaseof the Project ( RERA Registration Number P 49900022150) situated on the Plot bearing S No. 448/l/1 Plot No 16 demarcated by its boundaries (latitude and longitude of the end points) PLOT NO. 15 to the North ,30 FT WIDE ROAD the South ,30 FT WIDE ROAD to the East, PLOT NO 31 & 32 to the West of Division MEHRUN village MEHRUN taluka JALGAON District - JALGAON, PIN 425001, admeasuring 35? 03 sq.mts. area being developed by (Promoter's Name) Sir. VWe Anand Amol Mukund have undertaken assignment as Architect/Engineer of certirying Percentage of Completion of Construction Work of Sai " Plaza" the Building(s)/-0 Wing(s) of the _O_Phaseof the Project, situated on the plot bearing S No.448/1/1 Plot No.16 , of Division MEHRUN village MEHRUN taluka JALGAON District - JALGAON, PIN 425001, admeasuring 357 02 sq.mts area being developed by SAI SHIV CONSTRUCTION as per the approved plan 1. Following technical professionals are appointed by Or.r.merlPromoter:- (as applicable) (i) Shri Anand Amol Mukund as Architect/Engineer (ii) Shri Anand Amol Mukund as Structural Consultant (iii) lvl/s /Shri/Smt as MEP Consultant (iv) Shri NITIN PRAKASH PAWAR as Site Supervisor Based on Site Inspection, with respect to each ofthe Building/lVing ofthe aforesaid Real Estate Project, I certil, that as on the date ofthis certificate, the Percentage ofWork done for each ofthe buildingAVing ofthe Real Estate Project as registered vide number under GujRERA is as per table A herein below The percentage ofthe work executed with respect to each ofthe activity ofthe entire phase is detailed in Table A and B. Table - A Building " Sai Plaza" Percentage ofwork Sr. No Tasks/Activity done Excavation 00o/a 2 Basement(s) and Plinth oool J Sround Floor oool 4 lirst Floor 0001 5 number of Slabs of Suoer Structure oo"t o hternal walls, Intemal Plaster, Floorings within FlatslPremises, Doors and Windows to each of the Flat/Premises 7001 7 ianitary Fittinss within the Flat/Premises 5001 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and 8 Underground Water Tanks 5001 The extemal plumbing and extemal plaster, elevation, completion ofterraces with waterproofing ofthe 9 BuildingMing 7001 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing tr l0 enkance lobby/s, plinth protection, paving ofareas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation/Completion Certificate 2001 f' Table - B Intemal & Extemal DevelopmentWorks in Respect of the entire Registered Phase Proposed Percentage of Sr. No Comuron areas and Facilities Amenities Remarks (Yes/f.{o) work done lntemal Roads & Footoaths No VA 2 Water Suoolv Yes rco% J /nlamher lines SenticTank STP\ Yes 2s% Storm Water Drains NO 001 ) Landscaoins & Tree Plantine NO 001 6 qfreef I iohfino NO 001 7 v Rrrildi No N/A 8 Ireatment and disoosal ofsewase and sullase water /STP No N/A 9 Solid Waste Manasement & Disoosal No N/A t0 Water Conservation- Rain Water Harvestins . Percolatine WelyPit Yes looo/< II Enersv Manasement No N/A t2 Fire Protection and Fire Safetv Reouirements No N/A l3 llectrical Meter Room -station- Receivins Station {o 00/ t4 Others (ODtion to Add ml {o jo/t Yours Faithfullv. MR.ANANDAMOLMUKUND Sigrature & Name (IN BLOCK LETTERS) OF Architect/Engineer - nra td# r^\ t$re tt' t R.{ J.L .aflfQ