FORM 1 ARCHITECT'S CERTIFICATE To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: l4-Ol-2020 To The SAI SHIV CONSTRUCTION 56,SHIVRAM NAGARMJ COLLAGE ROAD. JALGAON Subject: CertificateofPercentageofCompletionofConstructionWorkof" Sai Plaza",0lNo.ofBuilding(s) Ol_Wing(s)ofthe_N//A_Phaseof the Project ( RERA Registration Number P 49900022150) situated on the Plot bearing S No. 448/1/1 Plot No. 16 demarcated by its boundaries (latitude and longitude of the end points) PLOT NO. 15 to the North ,30 FT WIDE ROAD the South ,30 FT WIDE ROAD to the East, PLOT NO 3l & 32 to the West of Division MEHRUN village MEHRUN taluka JALGAON District - JALGAON, PIN 425001, admeasuring 357.02 sq.mts area being developed by (Promoter's Name) Sir, UWe Anand Amol Mukund have undertaken assignment as Architect/Engineer of certifring Percentage of Completion of Constnrction Work of Sai " Plaza" the Building(s/_0_[ing(s) of the _0_______Phase of the Project, situated on the plot bearing S No.448/1/l Plot No.l6 , of Division MEHRUN village MEHRUN taluka JALGAON District - JALGAON, PIN 425001, admeasuring 357.02 sq.mts. area being developed by SAI SHMONSTRUCTION as per the approved plan. 1. Following technical professionals are appointed by Owner/Promoter:- (as applicable) (i) Shri Anand Amol Mukund as Architect/Engineer (ii) Shri Anand Amol Mukund as Structural Consultant (iii) lWs /Shri/Smt as MEP Consultant (iv) Shri NITIN PRAKASH PAWAR as Site Supervisor Based on Site Inspection, with respect to each ofthe BuildingAMing ofthe aforesaid Real Estate Project, I certifr that as on the date ofthis certificate, the Percentage ofWork done for each ofthe buildingAMing ofthe Real Estate Project as registered vide number under GujRERA is as per table A herein below The percentage ofthe work executed with respect to each ofthe activity ofthe entire pbase is detailed in Table A and B. Table - A Building " Sai Plaza" Percentage ofwork Sr. No Task/Activity 10001 2 Basement(s) and Plinth 10001 3 Sround Floor 10001 4 lirst Floor 8001 5 5 number of Slabs of Suoer Structure 10001 6 lntemal walls, Intemal Plaster, Floorings within Flats/Premises, Doors and Windows to each ofthe Flat/Premises 7001 7 Sanitarv Fittines within the Flat/Premises 001 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and 8 Underground Water Tanks 7001 The extemal plumbing and external plaster, elevation, completion oftenaces with waterproofing ofthe 9 BuildingAVing 001 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical frttings to Common Areas, electro, mechanical equipment, compliance to conditions of environmenVCRz NOC, Finishing tr l0 entrance lobby/s, plinth protection, paving ofareas appurtenant to BuildingAiling, Compound Wall and all other requirements as may be required to Obtain Occupatior/Completion Certificate 001 Table - B Intemal & Extemal Development Works in Respect of the entire Registered Phase Proposed Percentage of Sr. No Common areas and Facilities Amenities (Yes/l\lo) Rernarks work done I hternal Roads & FootDaths No N/A 2 rly'ater Suoolv Yes 10001 ) iewerase (chamher lines Sentic Tank STP) Yes 2501 4 itorm Water Drains NO 001 ) -andscaping & Tree Planting NO 001 6 itreet Liehtins NO ool 7 lommunitv Buildings No \I/A 8 freatment and disDosal ofsewage and sullase water /STP No \I/A 9 iolid Waste Management & Disposal No VA 10 ilater Consewation, Rain Water Harvesting, Percolatins Well/Pit Yes 001 1l lnergy Management No \I/A t2 lire Protection and Fire Safew Requirements No \I/A 13 llectical Meter Room, Sub-station, Receiving Station No ool l4 )thers (Option to Add more) No ool Yours Faithfully, NfD ^' TflTTl"m Sigrature & ngineer (License No