FORM I ARCHITECT'S CERTIFICATf, To be subnitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account, o4-to-2019 To The SAI SHIV CONSTRUCTION 56,SHIVRAM NAGARMJ COLLAGE ROAD, JALGAON Subject: CertificateofPercentageofCompletionofConstructionWorkof" Sai Ptaza",01No ofBuilding(s) 0l_Wing(s)ofthe_N//A_phaseof the Project ( RERA Registration Number P 49900022150) sjtuated on the Plot bearing S No 448/1/1 Plot No 16 demarcated by its boundaries (latitude and longitude of the end points) PLOT No. 15 to the North ,30 FT WIDE RoAD the South ,30 FT WIDE ROAD to the East, pLoT No 31 & 32 to the West of Division MEHRUN village MEHRUN taluka JALGAON District - JALGAoN, pIN 425001, admeasuring35T 02 sq mts. area being developed by (Promoter's Name) Sir, VWe Anand Amol Mukund have undertaken assignment as Architect/Engineer of certifing Percentage of Completion of Construction Work of Sai " Ptaza" the Building(s)/-0-!Ving(s) of the Phase of the Project, situated on the ptot bearing S No448/l/l plot No 16 , of -0 District - JALGAON, PIN 425001, Division MEHRUN village MEHRUN taluka JALGAON admeasuring 357 02 sqmts area being developed by SAI SHIV CONSTRUCTION as per the approved plan. 1 Following technical professionals are appointed by Owner/promoter:- (as applicable) (i) Shri Anand Amol Mukund as Architect/Engineer (ii) Shri Anand Amol Mukund as Structural Consultant (iii) M/s./ShrilSmt as MEP Consultant (iv) Shri NITIN PMKASH PAWAR as Site Supervrsor Based on Site Inspection, with respect to each ofthe Building/)Ving ofthe aforesaid Real Estate Project, I certiSi that as on the date ofthis certificate, the Percentage ofWork done for each ofthe buildingAVing ofthe Real Estate Project as registered vide number under GujRERA is aspertableAhereinbelow ThepercentageoftheworkexecutedwithrespecttoeachoftheactivityoftheentirephaseisdetailedinTabteAandB. Table - A Building " Sai Plaza" Sr. No Tasks/Activitv Percentage of work done I Excavation lOOo/t 2 Basement(s) and Plinth 10001 3 Sround Floor 10001 4 First Floor 50o/t 5 5_number ofSlabs ofSuper Structure 25o/t o .ntemal walls, Intemal Plaster, Floorings within Flats/Premises, Doors and windows to each of the Flat/premises 5001 7 ianitary Fittings within the Flat/Premises 0% Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and 8 Underground Water Tanks 50% The extemal plumbing and extemal plaster, elevation, completion ofterraces with waterproofing ofthe 9 BuildingAVing 0% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electricat fittings to Common Areas, electro, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to 10 entrance lobby/s, plinth protection, paving of areas appurtenant to Buildingffiing, Compound Wall and all other requirements as may be required to Obtain Occupation/Completion Certificate Oo/n Table - B Intemal & Extemal Development Works in Respect of the entire Registered Phase Proposed Percentage of Sr. No Common areas and Facilities Amenities Remarks /Yes/No l work done I lntemal Roads & FootDaths No N/A 2 ly'ater Suoolv Yes 10001 J lewerase (chamber. lines. SeDtic Tank, STP) Yes 2501 4 ;torm Water Drains NO ool 5 -andscaping & Tree Planting NO ool o itreet Liehtine {o 001 7 lommuniW Buildinss {o N/A 8 freatrnent and disDosal ofsewage and sullage water /STP t{o N/A 9 iolid Waste Manasement & Disposal t{o N/A 0 rtry'ater Consewation- Rain Water Harvestins . Percolatins WelyPit fes 001 I lnergy Management ),lo q/A 2 lire Protection and Fire Safetv Requirements ![o {/A J llectrical Meter Room. Suh-station, Receiving Station $o 00/ 4 )thers (ODtion to Add mor {o jot Yours Faithfully, MRA MUKUND