ARCHITECT’S CERTIFICATE (To be submitted at the time of Registration of Ongoing project and for Withdrawal of Money from Designated Account) Date: 12/08/2021. To M/s. Ramanand - Nagar, Shreyash Realties, 101,102, Rajiv Gandhi Town Hall,Pachora,Dist: - Jalgoan. Subject: Certificate of percentage of completion of construction work of Ramanand-Nagar No. of Building(s)/ of the 1st Phase of the project (MahaRERA Registration Number) Situated on the plot bearing C.N. No/S No. …104/1……….demarcated by its boundaries (Latitude and longitude of the end points) ……………to the North …S.NO. 102 to the South…18.00 M. W. Road to the East S. NO. 104/2 to the West S.NO. 104/2 of Division……..Village Pachora Taluka Pachora District Jalgoan PIN 424201 admeasuring 7303.35 sq.mts. Area being developed by M/s.Shreyash Realties, Sir, I / We…The Designers Collective……………… have undertaken assignment as Architect / Licensed Surveyor of certifying percentage of Completion of Construction work of the ……Ramanand- Ngar…………Building (s) /………….Wings (s) of the … 1st phase of the Project, situated on the plot bearing C.N. No/ Survey No. 104/1 Plot No 1 to 38 ( 100 Row-Houses ) of Division…………..... Village …… Pachora …….. Taluka …… Pachora ………… District…… Jalgoan …..PIN …424201….admeasuring …7303.35 sq. mts. area being developed by M/s.Shreyash Realties. Pachora. 1. Following technical professionals are appointed by Owner / Promoter:- (i) M/s/Shri/Smt… The Designers Collective ….as L.S./Architect; (ii) M/s/Shri/Smt……Milind Rathi …….as Structural Consultant (iii) M/s/Shri/Smt……Milind Rathi ....…as MEP consultant (iv) M/s /Shri/Smt…………………….………………… as Site Supervisor Based on Site Inspection, with respect to each of the building/wing of the aforesaid Real Estate project, I certify that as on the date of this certificate, the percentage of work done for each of the building/wing of the Real Estate project as registered vide number………………………….under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in table Table A Building /wing Number ………. (To be prepared separately for each Building/Wing of the project) Sr. No Task/Activity Percentage Of work done 1 Excavation 80% 2 …80…………………number of plinth 90% 3 ……… ………………number of Podiums Nil 4 Stilt Floor Nil 5 ………80……………..Number of Slabs Of Super Structure 90% 6 Internal Walls ,Internal Plaster, Floorings Within Flats /Premises, 90% Doors and Windows to each of the Row-House 7 Sanitary Fittings Within the Premises, Electrical Fittings Within 90% the Flat/Premises 8 Staircases, Overhead and Underground Water Tanks 90% 9 The external plumbing and external Plaster, Elevation , completion of 90% terraces with waterproofing of the building /wings, 10 Installation of Water pumps and Fittings , Electrical Fittings to Common 90% areas, Finishing to entrance Lobby/s, plinth Protection, Paving of are as appurtenant to Building Compound wall and all other requirements as may be required to obtain Occupation / Completion Certificate Table B Internal & External Development Works In respect of the entire Registered Phase Sr.No Common areas and Proposed Percentage Of Work Details Facilities, Amenities (Yes/No) Done 1. Internal Roads and Yes 90% WBM Footpaths’ Footpat 2. Water Supply Yes 90% Nagarparishad Footpat 3. Sewerage Yes 90% As per (chamber, Lines,Footpat Architectural Dwg. Septic Tank, STP) 4. Storm Water Yes 90% As per Drains Footpat Architectural Dwg. 5. Landscaping & Yes 90% As per Tree Planting Footpat Architectural Dwg. 6. Street Lighting Yes 90% As per Footpat Architectural Dwg. 7. Community No ------ N.A. Buildings Footpat 8. Treatment and Yes 90% Completed Disposal of Footpat Sewage and Sullage water 9. Solid Waste Yes 90% Completed Management & Footpat Disposal 10. Water Yes 90% Completed Conservation , Footpat Rain water harvesting 11. Energy No ----------- --------- Management Solar plant Footpat 12 1 Fire Protection Yes 00% N.A. And Fire safety Footpat Requirements 13. Electrical meter Yes 90% Completed R room, Sub-station, Footpat Receiving station 14. Others (Option to Yes N.A. N.A. Add more) Footpat Yours Faithfully For The Designers' Collective (ARCH. SANJAY MHALAS) License NO. CA/87/10988