I 1380, First Fl* r, F.iear ilanat Ho*pitai Lane hlo.S, f]h"ltJLE -424 001 (M S ] Tel . (025$2) e. : ?40627 FORM NO 2 ENGINEERS CERTIFICATE Date: - U/A5/2023 To, M/s. Vimal Developers, Prop. Rajendra Vasantrao Khankari CTS No. 4787115, BhideBaug, Deopur, Dhule-424002 Subject: Ceftificate of Percentage of Completion of Construction Work of01 No. of Building consisting of 1 Wings of the Project [MahaRERA Registration Number:- P498000339081 situated on the Plot bearing CTS No. LZ76 lsurvey no. 4U1 Plot No. 62 at Walwadi Dist. Dhule. Demarcated by its boundaries To the Nodh PIot No. 63, To the South Plot No. 61, To the East Plot No. 59, To the West Road, of Village: Walwadi City: Dhule, Taluka: Dhule, District: Dhule, PiN:424001, Division: tlashi( admeasuring about as per 7112 extrad - 3000 sq.fts & as pei' CTS record - 778-8 sq.mts. area being developed by M/s. Vimal Developers. Ref: - Maha RERA Registration N umber: - P49800033908 Respected Sir, I, Hemant Isai, have undeftaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being 01 No. of Building consisting of 1 Wings of the Project (MahaRERA Registration Number - P49800033908) situated on the Plot bearing crs No. 1276 lsurvey no. 4U1 Plot No 62 admeasuring about as per 7lL2 e*rac.. - 3000 sq.fts & as per CTS record - 'i- 278.8 sq.mts. area being developed by M/s. Vimal Developers. 1) Following technical professionals are appointed by Owner / Promoter :- a. Mls/Shri Nivara Construction, Ar. ShilpaTated as Architect; b. M/s /Shri Abhay V Bhadalikar as Structural Consultant c. Mls lShri NO ANY ONE as MEP Consultant d. M/s /Shri NO AI{Y OilE as Site Supervisor 2) I have estimated the cost of the completion to obtain Occupation Certifrcatel Completion Certificate, of the Civil, MEP and Allied works, of the Buildlng of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by me, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3) I estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs. 98,67,000 ( Rs. Ninety Eight Lakhs Sixty Seven only). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to h completed for the purpose of obtaining occupation ceftificate / completion certificate for the building from the Dhule Municipal Corporation, Dhule being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4) The Estimated Cost Incurred till date is calculated at Rs. L,25,62,3741-The amount of Estimated Cost Incurred is calculated on the basis of amount of Total Estimated cost. 5) The Balance mst of Completion of the Civil, MEP and AIIied works of the Building of the subject project to obtain Occupation Certificate / Completion Certificate from Dhule Municipal Corporation, Dhule (Planning Authority) is Estimated as Rs. NIL 6) I certiff that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A below: TABLE A One Residential Building onsisting of l Wing Ramkrushna Apaftment Sr.No. Particularc Amounts 1 Total Estimated cost of the building /Wing as on Rs. 98,67,000/- 04'10312022 i.e. date of registration 2 Cost incurred as on 3L10312023 i.e. date of Rs. 1,25,62,3741- registration (based on the Estimated aost) 3 Work done in Percentage(as Percentage of the 100 % estimated ost) 4 Balance Co6t to be Incurred(based on the -NIL- Estimated cost) 5 Cost Incurred on Additional /Extra Item as on Rs.16,48,118/- 3LlO3l2O23 i.e. date of registration not included in the Estimated Cost. Yours Faithfully, Hemant Isai (Engineer) HEMANT B.ISAI Consulting Engineer 1380,1stFloor, Near Pa nat Hospital,Dhulc L{rhrt*"' 1.1r,483{$