I 1380, First Floor, Near Panat Hospital nivara construction Lane No.S, DHULE - 424 0U (M.S.) Consulting Engineers Tel. : (02562) O^ :24A627 Prop. Er.Hemant Isai FORM NO 2 ENGINEERS CERTIFICATE Date: - 1410212023 To, M/s. Vimal Developers, Prop. Rajendra Vasantrao Khankari CTS No, 47B7|LS, BhideBaug, Deopur, Dhute_424OOZ subject: certificate of Percentage of completion of construction work of01 No. of Building consisting of 1 wings of the Project [MahaREM Registration Number: P498000339081 situated on the Plot bearing crs No. t276 /survev nu. 4111 plot No. 62 at Walwadi Dist. Dhule. Demarcated by its boundaries To the North : plot No, 63, To the South : plot No. 61, Io the East : plot No. 59, To the West : Road, of Village: warwadi city: Dhure, Taruka: Dhure, District: Dhure, pIN:424001, Division: Nashi( admeasuring about as per 7/L2 extrac..- 3ooo sq.fts & as per crs record - 278.9 sq.mts. area being deveroped by nals. vimar Deveropers. Ref:-MahaREM Registration Number: p49g0003390g Respected Sir, I, Hemant Isai, have undeftaken assignment of certifying Estimated Cost for the subject Real Estate project proposed to be registered under MahaREM, being 01 No' of Building consisting of 1 wings of the Project P498o0o33g0g) situated on the prot bearing (MahaRERA Registration Number - crs No. L276 lsurvey no.4uLprot No 62 admeasuring about as per T\LZ ertract - 3000 sq.fts & as per crs record _ z7g.g sq.mts. area being developed by M/s. Vimat Developers. 1) Following technical professionals are appointed by owner / promoter :_ a. M/s/shri Nivara construction, Ar. shitpaTated as Architect; \ b. M/s /Shri Abhay V Bhadalikar as Structural Consultant c. M/s /Shri NO ANY ONE as MEP Consultant d. Shri Hemant B Isai as Site Engineer 2) I have estimated the cost of the completion to obtain Occupation Ceftificatei Completion Certiflcate, of the Civil, MEP and Allied works, of the Building of the project; Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants by me, and the schedule of items and quantity for the entire work as calculated and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us' 3) I estimate Total Estimated cost of completion of the building(s) of the aforesaid project under reference as Rs. 1,11,17,000 ( RS. One Crore Eleven Lakhs Seventeen Thousand only). The estimated Total Cost of project is with reference MEP and allied work required to be completed for the purpose of to the Civil, the obtaining occupation certificate / completion certificate for the building from whose Dhule Municipal Corporation, Dhule being the Planning Authority under jurisdiction the aforesaid project is being implemented' 4) The Estimated cost Incurred till date is calculated at Rs. 1,29,28,000/-The of Total amount of Estimated cost Incurred is calculated on the basis of amount Estimated cost. The Balance cost of Completion of the Civil, MEP and Allied works of the Building s) of the subject project to obtain Occupation Certificate / Completion Certificate as Rs' from Dhule Municipal Corporation, Dhule (Planning Authority) is Estimated Nil. as 6) I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project completed on the date of this certificate is as given in Table A below: TABLE A one Residentiar Buirding consisting of 1 wing Ramkrishna Apartment fotat fsti 04103/2022 i.e. date Rs. l1l,lj,O@ of registration Cost ,n., registration (based on Rs. l,Zg,2BrO]y-. the Estimated cost) Work ron estimated cost) Balance Estimated cost) aor, ro. 37/1012022 i.e. date of registration not inctuded Yours Faithfully, (Ensineer) [, HEMANT B.ISAI' Gong_ql_ti n g En ginerer i .- _1380,ist Floor, Near Panat Hospital,Dhuler .\ \