&&, S&{EI;P& T.&T"ffim BEOFU&,DH{IIE LICENSE ]\IO. CA,/zOO 3 /3A8V FORM I ISee Regulationsl ARCHITECT'S CERTIFICATES (To tte submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) DATE: I4n5n023. To M/s.Vimal Developers Prop. Rajenda Vasantrao Khankari 4787115 BhideBaug Deopur, Dhule-424002 Subject: Certificate of Percentage of Compietion of Construction Work of 01 No. of Building/ Wing of the 01 Phase of the Project lMahaRERA Registration Number : P498000339081 situated on the Plot bearing CTS No. 1276, Survey no. 4111Plot No. 62. Demarcated by its boundaries (latitudeand longitude of the end points) To the North Plot No. 63, To the South Plotllo.6l, To the East PlotNo.59, To the West Road, Of Division: Nashik, Village: Walwadi,Deopur City:Dhule, Taluka: Dhule, District: Dhule, Pin:424002 Admeasuring as per 7i l2extract - 3000 sq.fts & as per CTS record - 278.8 sq.mts Area being developed by Mls Yimal Developers. SK, Il We ShilpaTated undertaken assignment as Architect ll-icensed Surveyor of certifying Percentage of Completion of Constmction Work of the 01 Building,TVing of the 0lPhase of the Project. situated on the plot bearing CTS No. 1276, Survey no. 4lll Plot No. 62.Of Division: Nashik, Village: walwadi Deopur City Dhule, Taluka: Dhule, District: Dhule, Pin:4240A2 Admeasuring: as per TllZextract - 3000 sq.fts & as per CTS record -278.8 area being developed by M/s Vimal Developers. 3. Following technical professionals are appointed by Owner / Promoter :- a) Ir4/s/ Nivara Construction, Ar. ShilpaTated as Architect ; b) Shri Abhay V Bhadalikar as Structural Consultant c) M/s /Shri NO ANY ONE as MEP Consultant d) M/s /Shri NO ANY ONE as Site Supervisor 4. Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project , I certifu that as on the date of this certificate, the Percentage of Work done for each of the building,Ailing of the Real Estate Project as registered vide number P49800033908 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Tatrle A Building lWing Number 01nos. (To be prepared separately for each Building iWing of the Project) Sr. Percentage of Task/Activitv No. work done I Excavation lAjaA 2 1nos. Plinth IAAN/ I \,ll' /O a J 00 number of Podiums 0% 4 Stilt Floor 1000/, E J 05 number of Slabs of Super Siructure taa% 6 Intemal walls, lntemal Plaster, t00% Flooring with in Flats/premises Door and windows to each of the Flatl premises 7 Sanitary Fitting within the FlaV premises lA0o/" Electric Fitting within the Flat/ premises 8 Staircases, Lifts Wells and Lobbies at each Floor level l0a% connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The extemal plumbing and extemal plaster, elevation, 1000/0 completion of teraces with waterproofing of the BuildineiWine. 10 Installation of lifts, water pumps, Fire Fighting Fittings and t00% Equipment as per CFO NOC, Electrical fittings to Common Areas,electro, mechanical equipment Compliance to conditions of environment I CP*Z NOC, Finishing to entrance lobby/s Plinth protection paving of areas appurtenant to BuildingiWing, compound wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE - B Internal & External Develonment Works in Respect of the entire Registered Phase Common areas and Proposed Percentage of Sr.No. Facilities, Amenities (Yes/No) Work done Details Intemal Roads & Footpaths No NA NA 2 Water Su:olv Yes 100 As oerDMC Sewarage (chamber, As per J lines, Septic Tank , Yes 100 STP) drawing 4 Storm Water Drains No NA NA Landscaping & Tree 5 Yes 100 As per rules Planting 6 Street Lighting No NA NA 7 Comrnunity Buildinss No NA NA Treatment and disposal 8 of sewage and sullage No NA NA water Solid Waste 9 manasement & Disoosal No NA NA Water conversation and 10 Yes 100 As per rules rain water harvestins 11 Enerqy Management No NA NA Fire protection and fire 12 No NA NA safetv Reouirements Electrical meter room, 13 sub-station receiving Yes 100 As drawing station Other (Option to Add 14 more) Yours Faithfull .94ry Signature Name:-Ar. ShilpaTated (License No. CA/2003/3 087.) AR. S}TTLFA TATED 0eopur, tllrule cA/2003/30s7