A.A. CHANDELE CONSULTING CIVIL ENGR RUKHMININAGAR, AMRAVATI MOB NO: 9766785598 FORM-2A [See MahaRERA Order No. ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certificate) (To be submitted at end of the financial year) Date: 31/03/2025 To. The GAYATRI BUILDERS AND DEVELOPERS (NITIN JUGALKISHOR CHENDULKAR), AMRA VATI Quality Assurance Certificate (Project Registration No. P50300011577 for the Year Ending 2025) Subject: Certificate for quality of materials used and quality of Construction and workmanship for the work of PARIKRAMA GREENS having MahaRERA Registration Number P50300011577 being developed by Gayatri Builders and Developers Sir. I A. A. Chandele have undertaken an assignment of supervision of this real estate project. Our Responsibility. To carry out the work in accordance with the development permission and as per the approved plan and submit certificate of supervision of work and to carry out material testing in-situ or in the authorized laboratory as per prevailing and applicable standards and to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and or other relevant code of practice. The details of the quality are as follows: 1. Structural Design, Stability and Testing Sr. Parameters Yes / Remarks No No 1 Whether soil investigations of the site has Yes Ok been conducted before the structural design and soil parameters have been accounted for in the structural design/ drawings? Whether Structural Engineer has been Yes Name: SubodhKumarV. Dhoke appointed for the Project? License No: STATE/R/2026/APL/24400 Mobile: 8600900969 Email: svdhoke.civil@gmail.com Whether the Inspection Registers, Site No order book and Quality control Test registers are maintained at the site properly and endorsed by the Engineer-in charge? 4 Whether testing facilities to check quality No of material is available at site? 5 Whether the statuary provisions for Yes Ok disaster resistance / earthquake resistant design have been incorporated, Specially in case of multi-storeyed Construction? 6 Has suitable cognizance been taken on No demarcated flood lines and appropriate precautions taken for protecting the site from flooding considering local flooding issues? 2. Input Materials Sr. Parameters Yes / Remarks No No Whether the following Building Materials Yes Ok confirm to relevant IS/BS/NBC code, or as per industry standards. If yes, provide details: (a) Cement, Concrete and Coarse Yes Ok Agregate (b) Steel and its alloys Yes Ok (c) Electrical wire, fittings and accessories Yes Ok (d) Plumbing and Sanitary Fittings Yes Ok 2 Whether regular tests of materials and Yes Ok construction products are being done from accredited labs also? If yes, details of such labs 3 Whether manufacturer test certificate for Yes Ok cement, steel, pipes etc. have been obtained with supply and records are being maintained? Whether Suitable water is being used for Yes Ok construction i. What is the source of water ii. Has water been tested and approved by Engineer-in-charge before construction ii. Has water been tested subsequently as per Requirement 3. Quality of Workmanship Sr. Parameters Yes / Remarks No No 1 Whether works of all the electrical Yes Ok wiring/connections/ lift installation / other electrical installations have been carried out under authorized/registered electrical engineer and its records has been maintained. 2 Whether all related works of plumbing & Yes Ok sanitary including installation of water supply systems, drainage systems, sewage systems, sinks, toilets etc. have been carried out under authorized /registered plumbers / sanitary contractors and its records has been maintained. 3 Whether all the work is being carried out Yes Ok under supervision of experienced and skilled professional. Further, workmanship and quality is satisfactory and up to the mark and the work has been acceptable within the permissible limits of deviations as per relevant code of practice. 4 Whether remedial measures are Yes Ok undertaken to & prevent Dampness Leakages?If yes, provide details 5 Whether safety precautions are undertaken Yes Ok during construction activities for all type of workers? 4. Mitcellaneous Sr. Parameters Yes / Remarks No No 1 - Whether third party quality inspection is Yes Ok being carried out on site during/after completion of the works. If yes, provide details Whether anti-termite treatment has been Yes Ok undertaken for the soil? 3 Whether fire-fighting Yes Ok arrangements has been undertaken under supervision of fire consultant? 4 Whether proper signages have been Yes Ok installed on site/completed building as per requirement. Whether precautions are undertaken to Yes Ok avoid air pollution during construction? Please specify. 6 Whether records of all test reports/ results Yes Ok have been properly kept in the prescribed formats to be available at site for viewing by allottees and to be handed over to the association of allottees Whether all relevant records including Yes Ok sanctioned Building plans, utility drawings, Various test reports / results have been properly kept in the prescribed formats to be handed over to the association of allottees. innovative/ cost effective/green No Any technology has been used for improving Quality/nergy efficiency. Agreed and accepted by Ygs Faithfully, Shrec Gayatri AMIT CHANDELE Builders And Developers D.C.E., B.E. (CIVIL) L.NO.R.P.Amt/Er-1/106/2020-2022 Signature of Promoter Rukhmini Nagar, Amravati Name: Gayatri Builders & Developers Mob - 976678559 8 Date: 31/03/2025 Signature of Engineer Name: A. A. Chandele Qualification: B.E. Civil License No; STATE/R/2024/APL/1742 Phone No: 9766785598 Place: Amravati