A.A. CHANDELE CONSULTING CIVIL ENGR RUKHMINI NAGAR, AMRAVATI MOB NO: 9766785598 FORM-2A [SeeMahaRERA Order No. ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certificate) (Tobe submitted at endof the financial year) Date: 3I/03/2024 To, The GAYATRI BUILDERS AND DEVELOPERS (NITIN JUGALKISHOR CHENDULKAR), AMRAVATI Quality Assurance Certificate (Project Registration No. P50300011577 for the Year Ending 2024) Subject: Certificate for quality of materials used and quality of Construction and workmanshipfor the work of PARIKRAMA GREENS having MahaRERA Registration Number P50300011577 beingdeveloped by Gayatri Builders and Developers Sir, I A. A. Chandele have undertaken an assignment of supervision of this real estate project. Our Responsibility. To carry out the work in accordance with the development permission and as per the approved plan and submit certificate of supervision of work and to carry out material testing in-situ or in the authorized laboratory as per prevailing and applicable standards and to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and or other relevant code of practice. The details of the quality are as follows: 1. Structural Design, Stability and Testing Parameters Yes Remarks Sr. / No No 1 Whether soil investigations of the site has Yes Ok been conducted before the structural design and soil parameters have been accounted for in the structural design/ drawings? 2 Whether Structural Engineer has been Yes Name: SubodhKumar V. Dhoke License No: STATE/R/2026/APLI24400 appointed for the Project? Mobile: 8600900969 Email: svdhoke.civil @gmail.com 3 Whether the Inspection Registers, Site No order book and Quality control Test registers are maintained at the site properly and endorsed by the Engineer-in charge? 4 check quality No Whether testing facilities to of material is available at site? Whether the statuary provisions for Yes Ok disaster resistance / earthquake resistant design have been incorporated, Specially in case of multi-storeyed Construction? Has suitable cognizance been taken on No demarcated flood lines and appropriate precautions taken for protecting the site from flooding considering local flooding issues? 2. Input Materials Sr. Parameters Yes / Remarks No No Whether the following Building Materials Yes Ok confirm to relevant IS/BS/NBC code, or as per industry standards. If yes, provide details: (a) Cement, Concrete and Coarse Yes Ok Aggregate (b) Steel and its alloys Yes Ok (c) Electrical wire, fittings and accessories Yes Ok (d) Plumbing and Sanitary Fittings Yes Ok 2 Whether regular tests of materials and Yes Ok construction products are being done from accredited labs also? If yes, details of such labs 3 Whether manufacturer test certificate for Yes Ok cement, steel, pipes etc. have been obtained with supply and records are being maintained? 4 Whether Suitable water is being used for Yes Ok construction i. What is the source of water ii. Has water been tested and approved by Engineer-in-charge before construction iii. Has water been tested subsequently as per Requirement 3. Quality of Workmanship Sr. Parameters Yes / Remarks No No 1 Whether works of all the electrical Yes Ok wiring/connections/ lift installation / other electrical installations have been carried out under authorized/registered electrical engineer and its records has been maintained. 2 Whether all related works of plumbing & Yes Ok sanitary including installation of water supply systems, drainage systems, sewage systems, sinks, toilets etc. have been carried out under authorized /registered plumbers / sanitary contractors and its records has been maintained. 3 Whether all the work is being carried out Yes Ok under supervision of experienced and skilled professional. Further. workmanship and quality is satisfactory and up to the mark and the work has been of acceptable within the permissible limits deviations as per relevant code of practice. 4 Whether remedial measures are Yes Ok undertaken to prevent Dampness & Leakages?If yes, provide details Yes Ok Whether safety precautions are undertaken during construction activities for all type of workers? 4. Miscellaneous Sr. Parameters Yes / Remarks - No 1 Whether third being carried party quality inspection out on site during/after is No Yes Ok completion of the works. If yes, provide details 2 Whether anti-termite treatment has been Yes Ok undertaken for the soil? 3 Whether fire-fighting arrangements has Yes Ok been undertaken under supervision of fire consultant? 4 have been Yes Ok Whether proper signages installed on sitelcompleted building as per requirement. to Yes Ok Whether precautions are undertaken air pollution during construction? avoid Please specify. reports /results Yes Ok 6 Whether records of all test have been properly kept in the prescribed formats to be available at site for viewing by allottees and to be handed over to the association of allottees Yes Ok 7 Whether all relevant records including sanctioned Building plans, utility test reports / results drawings, Various have been properly kept in the prescribed formats to be handed Over to the association of allottees. cost effective/green No Any innovative/ technology has been used for improving Quality/Energy efficiency. Xeurs Faithfully, Agreed and accepted by Shrec Gayatri Bokkexs And Deveiopers AMIT CHANDELE D.C.E., B.E.(CIVIL) L.No.R.P.AmVEr-1/106/2020-2022 Signature of Promoter Rukhmini Nagar, Amravati Name: Gayatri Builders & Developers Mob - 9766785598 Date: 31/03/2024 Signature of Engineer Name: A. A. Chandele Qualification: B.E. Civil License No: STATE/R/2024/APL/||742 PhoneNo: 9766785598 Place: Amravati