A. A. CHANDELE CONSULTING CIVIL ENGINEER RUKHMININAGAR, AMRAVATI MOB NO: 9766785598 AnnexureC FORM-2A |See MahaRERA order no.5 of 2018] ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE (SiteSupervisor's Certificate) (To be submitted at the end of Financial Year) Date: 31/03/2018 To, TheGAYATRI BUILDERS AND DEVELOPERS (NITIN JUGALKISHOR CHENDULKAR), Quality Assurance Certificate (Certificate No for the Year Ending Subject :Certificate for quality of materials used and quality of Construction and workmanship for the Work of Parikrama Greens having MahaRERA Registration Number P50300011577being developed by Gayatri Builders and Developers. Sir, / We A. A. CHANDELE have undertaken an assignment of supervision of this real estate project. Our Responsibility I/We are responsible for carrying out the work in accordance with the development permission and as per the approved plan and subm it certificate ofsupervision of work and to carry out material testing in-situ or in the authorized laboratory and to ensure quality of work andworkmanship as per prescribed specifications, and asper NBC and or other relevant code of practice. 1. Input Materials, Fixtures and Fittings I/We hereby certify that all Construction material, Fixtures and Fittings with regard to the flooring. Electrical, Sanitary etc and amenities to be provided by the fittings Promoter in and the Apartmentas are as per specifications the said Project, building mentioned in Annexure 'F.. of Agreement of Sale. For those items, where no specifications have been mentioned in agreement of sale, the materials. Fixtures and Fittings used conform to the relevant BIS Standards / IS / National Building codes or as per industry standards. 2. Workmanship - /we hereby certify that work has been carried out under our supervision. We further certify that workmanship and quality is satisfactory and up to the mark and the work has been acceptable within the permissible limits of deviations as per relevant code of practice. 3. Structural Engineer - Promoters hos engaged structural engineer Mr. ..having Licenses No. having COffice No. Cell No. The structural design of buildings in done under his this prject has been supervisi on. The formwork and concrete mix done as per IS design has been 10262:2009 or as per other relevant codes as applicable. His periodic checks and certificates for STABILITY and SAFETY have been kept on record. 5. Preservation of records- Record of all test results of this project have been proporly kept in the prescribed formats and will be preserved at least up to defect liability period or for the period as required by any other provision of law. Please specify deviation in quality of materials or any other item of work which were not conformingto the specifications as mentioned in Agreement of Sate: Agreed & Accepted by: AMIT CHANDELE B.E. (CIVIL) Gayatii D.C.E., BErsAnd Develger$ L.No.R.P.Am/Er-1/106/2020-2022 RukhminiNagar, Amravati Mob-9766785598 Parikrama Signature of Promoter Yours Faithfully Name: Gayatri Builders & Developers Signature Date: 31/03/2018 AMIT CHANDELE B.E. Civil Mob: 9766785598 Place: Amravati