AR. PRIYANKA CHENDULKAR B. ARCH Rukhmini Nagar, Amravati Mob: 95454829 11 FORM 1 ARCHITECT'SCERTIFICATE To, Date: 30/06/2026 The GAYATRI BUILDERS AND DEVELOPERS (NITIN JUGALKISHOR CHENDULKAR), Subject: Certificate of Cost Incurred for Development of PARIKRAMA GREENS having MahaRERA Registration Number P50300011577 (Only applicable after Project Registration) being Developed by Gayatri Builders and Developers. Sir, IWe PRIYANKA CHENDULKAR have undertaken assignment as Architect/ Licensed Surveyor of Certifying Percentage of Completion of Construction Work of Parikrama Greens having MahaRERA Registration Number P50300011577 (Only applicable after Project Registration) being Developed by Gayatri Builders and Developers. Based on the Site Inspection, with respect to the Layout / each Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Building/ Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. Table A Building / Wing Number 1 in Parikrama Greens (to be prepared separately for each Layout/Building Wing of Project) Percentage of Actual Work Sr.No. Tasks /Activity Done (As on date of Certifcate) 1 Excavation 75% 2 Basements (ifany) 3 Podiums (if any) Plinth 60% 5 Stilt Floor 45% Slab of Super Structure 20% Walls, Internal Plaster, Floorings, Doors, Internal 0 7 windows within Flats / Premises Flats / Premises Sanitary Fittings within Staircases, Lift Wells & Lobbies at each Floor Water Tanks Level Overhead and Underground Plumbing External & External Plaster, Elevation, 10 of Completion of Terraces, with waterproofing the Building / Wing Installation of lifts, water pumps, Fire Fighting Fittings and Equipment's as per CFO NOC, fittings to Common Areas, ,electro Electrical to mechanical equipment's, Compliance of environment / CRZ NOC, 0 11 conditions of areas Finishing of entrance lobby/s, paving appurtenant to Building, Compound Wall and all other requirements as may be required to obtain Occupation/ CompletionCertificate TABLE-B Common Areas (Internal & External Development Works) in respect of the Registered Phase/ Project Number Percentage of Details S. No. Common Areas and Facilities Proposed (Yes/No) Actual Work Done (As on date of Certifcate) 1 Internal Roads & Footpaths Yes 0% As per Plan 2 Yes 100% Borewel1 Water Supply 3 Sewerage (Chamber, Lines. Septic Tank, STP) Yes 35% Septic Tank 4 Storm Water Drains No 5 15% Trees Landscaping & Tree Planting Yes 6 Street Lighting No Community Buildings No 8 Treatment and disposalof No Sewage and Sullage water 9 Solid Waste management & No Disposal Rain Water 10 Water Conservation / Rain Yes 0% Harvesting Water Harvesting 11 No Energy Management 12 Fire Protectionand Fire Safety Yes 0% As per Plan requirements 13 Electrical Meter Room, Sub No Station, Receiving Station 14 (Option to Add more) No Others Agreed & Accepted by: Reg: Ho. . Shiayatri CA2019/11579) Buildert And Developers ARCH ITECS Signature of Promoter Yours Faithfully Name: Gayatri Builders & Developers Signature Date: 30/06/2026 PRIYANKA CHENDULKAR Reg No:CA/2019/115779