AR.PRIYANKA CHENDULKAR B. ARCH Rukhmini Nagar, Amravati Mob: 9545482911 FORM 1 ARCHITECT'S CERTIFICATE Date:31/03/2026 To, The GAYATRI BUILDERS AND DEVELOPERS (NITIN JUGALKISHOR CHENDULKAR), Subject: Certificate of Cost Incurred for Development of PARIKRAMA GREENS having Number P50300011577 (Only applicable after Project MahaRERA Registration Registration) being Developed by Gayatri Builders and Developers. Sir, as Architect/ Licensed I/We PRIYANKA CHENDULKAR have undertaken assignment ofConstruction Work of Parikrama Greens Surveyorof Certifying Percentage of Completion having MahaRERA Registration Number P50300011577 (Only applicable after Project Registration) being Developedby Gayatri Builders and Developers. theaforesaid Based on the Site Inspection, with respect to the Layout /each Building/Wing of of Work Done that as on date of this Certificate, the Percentage Real Estate Project, I certify for each ofthe Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. Table A Building/ Wing Number 1 in Parikrama Greens separately for each Layout/Building/ Wing of Project) (to be prepared Percentageof Actual Work Tasks / Activity Done Sr.No. (Ason date of Certifcate) 1 Excavation 75% Basements (ifany) 3 Podiums (ifany) 4 Plinth 60% 5 Stilt Floor 45% Slab of Super Structure 20% Internal Walls, Internal Plaster, Floorings, Doors, 7 0 windows within Flats/ Premises Sanitary Fittings within Flats / Premises Staircases, Lift Wells & Lobbies at each Floor Level Overhead and Underground Water Tanks 10 External Plumbing & External Plaster, Elevation, Completion ofTerraces, with waterproofing of the Building / Wing Installation of lifts, water pumps, Fire Fighting Fittings and Equipment's as per CFO NOC, Electrical fittings to Common Areas, ,electro mechanical Compliance to equipment's, 11 conditions of environment /CRZ NOC, Finishing ofentrance lobby/s, paving of areas appurtenant to Building, Compound Wall and all other requirements as may be required to obtain Occupation /Completion Certificate TABLE -B Common Areas (Internal & External DevelopmentWorks) in respect of the Registered Phase/ Project Number Proposed Details No. Common Areas and Facilities S. Percentage of (Yes/No) Actual Work Done (Ason date of Certifcate) 1 Internal Roads & Footpaths Yes 0% As per Plan 2 Yes 100% Borewell Water Supply 3 Sewerage (Chamber,Lines, Yes 35% Septic Tank Septic Tank, STP) 4 Storm Water Drains No 15% Trees & Tree Planting Yes Landscaping 6 No Street Lighting 7 No Community Buildings Treatment and disposal of No Sewage and Sullage water Solid Waste management & No Disposal 10 Water Conservation / Rain Rain Water Yes 0% Water Harvesting Harvesting 11 Energy Management No 12 Fire Protectionand Fire Safety Yes 0% As per Plan requirements 13 Electrical Meter Room, Sub No Station, Receiving Station 14 Others ( Option to Add more) No Agreed & Accepted by: Reg. No. Shrd yatri ENDULk CA2019/115779) Builders And Developers TCHITEC Signature ofPromoter Yours Faithfully Name: Gayatri Builders & Developers Signature Date: 31/03/2026 PRIYANKA CHENDULKAR Reg No: CA/2019/15779