AR. PRIYANKA CHENDULKAR B. ARCH Rukhmini Nagar, Amravati Mob: 9545482911 FORM 1 ARCHITECT'S CERTIFICATE To, Date: 31 /03/2024 The GAYATRI BUILDERS AND DEVELOPERS (NITIN JUGALKISHOR CHENDULKAR), Subject: Certificate of Cost Incurred for Development of PARIKRAMA GREENS having MahaRERA Registration Number P50300011577 (Only applicable after Project Registration) being Developed by Gayatri Builders and Developers. Sir. I/ We PRIYANKA CHENDULKAR have undertaken assignment as Architect/ Licensed Surveyor of Certifying Percentage of Completion of Construction Work of Parikrama Greens having MahaRERA Registration Number P50300011577 (Only applicable after Project Registration) being Developed by Gayatri Builders and Developers. Based on the Site Inspection, with respect to the Layout / each Building/Wing of the aforesaid Real Estate Project, Icertify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Plhase is detailed in Table-B. Table A Building / Wing Number 1 (ABC Wing) in Parikrama Greens (to be prepared separately for each Layout/Building/Wing of Project) Percentage of Actual Work Sr. No. Tasks / Activity Done (Ason date of Certifcate) 1 Excavation 100% 2 Basements (if any) 3 Podiums (if any) 4 Plinth 0 Stilt Floor Slab of SuperStructure Internal Walls, Internal Plaster, Floorings, Doors, 7 windows within Flats / Premises Sanitary Fittings within Flats / Premises Staircases, Lift Wells & Lobbies at each Floor Level Overhead and Underground Water Tanks 10 External Plumbing & External Plaster, Elevation, Completion of Terraces, with waterproofing 0 of the Building / Wing Installation of lifts, water pumps, Fire Fighting Fittings and Equipment's as per CFO NOC, Electrical fittings to Common Areas, ,electro - mechanical equipment's, Compliance to 11 conditions of environment / CRZ NOC, Finishing of entrance lobby/s, paving of areas appurtenant to Building, Compound Wall and all other requirements as may be required to obtain Occupation /Completion Certificate TABLE–B Common Areas (Internal & External Development Works)in respect of the Registered Phase/ Project Number S.No. Common Areas and Facilities Proposed Percentage of Details (Yes/No) Actual Work Done (As on date of Certifcate) 1 Internal Roads & Footpaths Yes 50% As per Plan 2 Water Supply Yes 100% Borewell 3 Sewerage(Chamber,Lines, Yes 80% Septic Tank Septic Tank, STP) 4 Storm Water Drains No Landscaping & Tree Planting Yes 50% Trees 6 No Sreet Lighting 7 No Community Buildings Treatment and disposal of No Sewage and Sullage water Solid Waste management & No Disposal / Rain Rain Water 10 Water Conservation Yes 0% Harvesting Water Harvesting 11 Energy Management No 12 Fire Protection and Fire Safety Yes 0% As per Plan requirements 13 Electrical Meter Room, Sub No Station. Receiving Station 14 Others ( Option to Add more) No Agreed & Accepted by: No. Reg, Gkyafi CA2019/115719 Builders And Developers ARC Parikrama Signature of Promoter Yours Faithfully Name: Gayatri Builders & Developers Signature Date: 31/03/2024 PRIYANKA CHENDULKAR Reg No: CA/2019/115779