AR. PRIYANKA CHENDULKAR B. ARCH Rukhmini Nagar,Amravati Mob: 9545482911 FORM I ARCHITECT'S CERTIFICATE To, Date:31/12/2023 The GAYATRI BUILDERS AND DEVELOPERS (NITIN JUGALKISHOR CHENDULKAR), Subject: Certificateof Cost Incurred for Development of PARIKRAMA GREENS having MahaRERA Registration Number P50300011577 (Only applicable after Project Registration) being Developed by Gayatri Builders and Developers. Sir. I/We PRIYANKA CHENDULKARhave undertaken assignment as Architect/ Licensed Surveyor of Certifying Percentage of Completion of Construction Work of Parikrama Greens having MahaRERA Registration Number P50300011577 (Only applicable after Project Registration) being Developed by Gayatri Builders and Developers. Based on the Site Inspection, with respect to the Layout / each Building/ Wing of the aforesaid Real Estate Project, Icertify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. Table A Building/ Wing Number 1 (ABC Wing) in Parikrama Greens (to be prepared separately for cach Layout/Building/Wing of Project) Percentage of Actual Work Sr. No. Tasks / Activity Done (Ason date of Certifcate) 1 Excavation 100% Basements (if any) 3 Podiums(if any) 4 Plinth 0 Stilt Floor 0 Slab of SuperStructure 0 Internal Walls, Internal Plaster. Floorings, Doors, windows within Flats / Premises Sanitary Fittings within Flats / Premises 0 Staircases, Lift Wells & Lobbies at each Floor Level Overhead and Underground Water Tanks 10 External Plumbing & External Plaster, Elevation, Completion of Terraces, with waterproofing 0 of the Building /Wing Installation of lifts, water pumps. Fire Fighting Fittings and Equipment's as per CFO NOC, Electrical fittings to Common Areas, .electro - mechanical equipment's, Compliance to 11 conditions of environment / CRZ NOC, Finishing of entrance lobby/s. paving areas of appurtenant to Building, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate TABLE –B Common Areas (Internal& External Development Works) in respect of the Registered Phase/ Project Number S. No. Common Areas and Facilities Proposed Percentage of Details (Yes/No) Actual Work Done (As on date of Certifcate) Internal Roads & Footpaths Yes 50% Asper Plan 2 Water Supply Yes 100% Borewell Sewerage(Chamber,Lines, Yes 80% Septic Tank Septic Tank, STP) 4 Storm Water Drains No Landscaping & Tree Planting Yes 50% Trees 6 No Street Lighting 7 No Community Buildings Treatment and disposal of No Sewage and Sullage water Solid Waste management & No Disposal Rain Water 10 Water Conservation / Rain Yes 0% Water Harvesting Harvesting 11 No Energy Management 12 Fire Protection and Fire Safety Yes 0% As per Plan requirements 13 Electrical Meter Room, Sub No Station, Receiving Station 14 Others ( Option to Add more) No Agreed & Accepted by: GHEND No. Reg. CA2019/115779) Gayatri Builders Arnd Developers ARCHHITECS Parikrama Signature of Promoter Yours Faithfully Name: Gayatri Builders &Developers Signature Date: 31/12/2023 PRIYANKA CHENDULKAR Reg No: CA/2019/115779