AR.PRIYANKA CHENDULKAR B. ARCH Rukhmini Nagar,Amravati Mob: 954548291 1,79723 18886 FORM 1 ARCHITECT'S CERTIFICATE To. Date: 31/03/2023 The GAYATRI BUILDERS AND DEVELOPERS ( NITIN JUGALKISHOR CHENDULKAR), Subject: Certiticate of Cost Incurred for Developmentof PARIKRAMA GREENS having MahaRERA Registration Number P50300011577 (Only applicable after Project Registration) being Developed by Gayatri Builders and Developers. Sir. I/We PRIYANKA CHENDULKAR have undertaken assignment as Architect/ Licensed Surveyor of Certifying Percentage of Completion of Construction Work of Parikrama Greens having MahaRERA Registration Number P50300011577 (Only applicable after Project Registration) being Developed by Gayatri Builders andDevelopers. Based on the Site Inspection, with respect to the Layout / each Building/Wing of the aforesaid Real Estate Project, Icertify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. Table A Building/Wing Number 2 (CD Wing) in Parikrama Greens (to be prepared separately for each Layout/Building/Wing of Project) Percentage of Actual Work Sr. No. Tasks / Activity Done (As on date of Certifeate) Excavation 100% 2 Basements(if any) 3 Podiums(if any) 4 Plinth 100% Stilt Floor 100% 6 Slab of SuperStructure 100% Internal Walls,Internal Plaster, Floorings, Doors, 7 100% windows within Flats / Premises 8 Sanitary Fittings within Flats /Premises 100% Staircases,Lift Wells & Lobbies at each Floor Level Overhead and Underground Water Tanks 100% 10 External Plumbing & External Plaster, Elevation, Completion of Terraces, with waterproofing of 100% the Building / Wing Installation of lifts, water pumps, Fire Fighting Fittings and Equipment's as per CFO NOC, Electrical fittings to Common Areas, ,electro mechanical Compliance to equipment's, 11 conditions of environment / CRZ NOC, 100% Finishing of entrance lobby/s, paving of areas appurtenant to Building, Compound Wall and all other requirements as may be required to obtain Occupation /Completion Certificate TABLE- B Common Areas (Internal & External Development Works) in respect of the Registered Phase/ Project Number Percentage of Details S. No.Common Areas and Facilities Proposed (Yes/No) Actual Work Done (As on date of Certifcate) 50 Roads & Footpaths Yes As per Plan 1 Internal 2 Yes 100% Borewell Water Supply Sewerage(Chamber,Lines, Septic Tank, STP) Yes 100% Septic Tank 4 Storm Water Drains No 50% Trees Landscaping & TreePlanting Yes Street Lighting No Community Buildings No 8 Treatment and disposal of No Sewage and Sullage water Solid Waste management & No Disposal Rain Rain Water 10 Water Conservation / 50% Yes Harvesting Water Harvesting 11 Energy Management No 12 Fire Protection and Fire Safety No requirements 13 Electrical Meter Room, Sub No Station,Receiving Station 14 Others (Option to Add more) No Agreed & Accepted by: CHEN N 79 e0. U19/11 Gayatri Builders And Developers ARCHI Parikrama Signature of Promoter Yours Faithfully Name: Gayatri Builders & Developers Signature Date: 31/03/2023 PRIYANKA CHENDULKAR Reg No:CA/2019/115779