AR. PRIYANKA CHENDULKAR B.ARCH Rukhmini Nagar,Amravati Mob: 9545482911 FORM 1 ARCHITECT'S CERTIFICATE Date: 30/09/2022 To, The BUILDERS AND DEVELOPERS (NITIN JUGALKISHOR GAYATRI CHENDULKAR), Subject: Certificate of Cost Incurred for Development of PARIKRAMA GREENS having MahaRERA Registration Number P50300011577 (Only applicable after Project Registration) being Developed by Gayatri Builders and Developers. Sir, I/We PRIYANKA CHENDULKARhave undertaken assignment as Architect/ Licensed of Certifying Percentage of Completion of Construction Work of Parikrama Surveyor Greens having MahaRERA Registration Number P50300011577 (Only applicable after Project Registration)being Developed by Gayatri Builders and Developers. the Layout each Building/Wing of the Based on the Site Inspection, with respect to / as on date of this Certificate, the Percentage of aforesaid Real Estate Project, I certify that Work Done for each of the Building/Wing of the Real Estate Project under MahaRERA is as each of the per Table-A herein below. The percentage of work executed with respect to activity of entire Phase is detailed in Table-B. Table A Building/Wing Number 1 in Parikrama Greens of Project) (to be prepared separately for each Layout/Building/Wing Percentage of Actual Work Tasks /Activity Done Sr. No. (Ason date of Certifcate) 1 Excavation 75% 2 Basements (if any) 3 Podiums (if any) 4 Plinth 60% Stilt Floor 45% 6 Slab of Super Structure 20% Internal Walls, Internal Plaster, Floorings, Doors, 7 windows within Flats / Premises 8 Sanitary Fittings within Flats / Premises Staircases, Lift Wells & Lobbies at each Floor Level Overhead and Underground Water Tanks 0 10 External Plumbing & External Plaster, Elevation, Completion of Terraces, with waterproofing of the Building / Wing Installation of lifts, water pumps, Fire Fighting Fittings and Equipment's as per CFO NOC, Electrical fittings to Common Areas, ,electro - mechanical equipment's, Compliance to 11 conditions of environment / CRZ NOC, 0 Finishing of entrance lobby/s, paving of areas appurtenant to Building, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate TABLE -B Common Areas (Internal & External Development Works) in respect of the Registered Phase/ Project Number S. No. Common Areasand Facilities Proposed Percentage of Details (Yes/No) Actual Work Done (As on date of Certifeate) 1 Internal Roads & Footpaths Yes 0% As per Plan 2 Water Supply Yes 100% Borewell Lines, 3 Sewerage(Chamber, Yes 35% Septic Tank Septic Tank, STP) 4 Storm Water Drains No 5 Yes 15% Trees Landscaping & Tree Planting 6 No Street Lighting 7 No Community Buildings Treatmentand disposal of No Sewage and Sullage water Solid Waste management & No Disposal Rain Rain Water 10 Water Conservation / Yes 0% Harvesting Water Harvesting 11 Energy Management No 12 Fire Protection and Fire Safety Yes 0% Asper Plan requirements 13 Electrical Meter Room, Sub No Station,Receiving Station 14 No Others ( Option to Add more) Agreed & Accepted by: N ANKA GHE Reg.No. A2019/115719) Buttders And Developers Parikrama RCHITEO Signature of Promoter Yours Faithfully Name: Gayatri Builders & Developers Signature Date: 30/09/2022 PRIYANKA CHENDULKAR Reg No: CA/2019/115779