AR. PRIYANKACHENDULKAR B. ARCH RukhminiNagar, Amravati Mob:95454829 1 1 FORM1 ARCHITECT'S CERTIFICATE To. Date: 30/09/2018 The GAYATRI BUILDERS AND DEVELOPERS (NITIN JUGALKISHOR CHENDULKAR), Subject: Certificate of Cost Incurred for of PARIKRAMA GREENS having Development MahaRERA Registration Number P50300011577 (Only applicable after Project Registration) being Developed by Gayatri Builders and Developers. Sir, I/We PRIYANKA CHENDULKAR have undertaken assignment as Architect/ Licensed Surveyor of Certifying Percentage of Completion of Construction Work of Parikrama Greens having MahaRERA Registration Number P50300011577 (Only applicable after Project Registration) being Developed by Gayatri Builders and Developers. Based on the Site Inspection, with respect to the Layout / each Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. Table A Building/WingNumber 1 in Parikrama Greens (to be prepared separately for cach Layout/Building/Wing of Project) Percentage of Actual Work Sr. No. Tasks / Activity Done (Ason date of Certifcate) 1 Excavation 75% 2 Basements (ifany) 3 Podiums (if any) Plinth 60% 5 Stilt Floor 45% Slab of SuperStructure 20% Internal Walls, Internal Plaster, Floorings, Doors. windows within Flats / Premises Sanitary Fittings within Flats/Premises Staircases,Lift Wells & Lobbies at each Floor Level Overhead and Underground Water Tanks 10 External Plumbing & External Plaster. Elevation. Completion of Terraces, with waterproofing of 0 the Building / Wing Installation of lifts, water pumps, Fire Fighting Fittings and Equipment's as per CFO NOC, Electrical fittings to Common Areas, .electro - mechanical equipment's, Compliance to 11 conditions of environment / CRZ NOC. Finishing of entrance lobby/s, paving of areas appurtenant to Building, Compound Walland all other requirements as may be required to obtain Occupation / Completion Certificate TABLE- B Common Areas (Internal& External Development Works) in respect ofthe Registered Phase/ Project Number S. No. Common Areas and Facilities Proposed Percentage of Details (Yes/No) Actual Work Done (As on date of Certifcate) 1 |Internal Roads & Footpaths Yes 0% Asper Plan 2 Water Supply Yes 100% Borewell 3 Sewerage(Chamber,Lines, Septic Tank, STP) Yes 35% Septic Tank 4 Storm Water Drains No Landscaping & Tree Planting Yes 15% Trees Street Lighting No 7 Community Buildings No Treatment and disposal of No Sewage and Sullage water 9 Solid Waste management & No Disposal 10 Water Conservation / Rain Rain Water Yes 0% Water Harvesting Harvesting 11 Energy Management No 12 Fire Protection and Fire Safety Yes 0% Asper Plan requirements 13 Electrical MeterRoom, Sub No Station,Receiving Station 14 Others ( Option to Add more) No Agreed & Accepted by: ANKA N Reg. eA2019/ No. Gayafi ARM ENDU, Builders And Developers Parikrama Signature of Promoter Yours Faithfully Name: Gayatri Builders & Developers Signature Date: 30/09/2018 PRIYANKA CHENDULKAR Reg No: CA/2019/115779