ET. NARENDRA KEDAR B E (CIVIt_) Officc : Opp. Nirmal Bakefy. \','\ilDFiA. Mobile N"o. : 982222843'7 Dare : l0/08/2017 FROM-2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time olRegistration ofOngoing Ploject and for withdlas'al of Money fi om Designated Account- Project wise) Date: lo l he Maa Vaishanavi City Developers, Sawgat Colony, Karla Road, Wardha. Subject: Certificate of Cdst Incurred for Developmenf of Project Name - Mahalaxmi Residency fol Construction of Maa Vaishanavi City Developers building (s) I Wing(s) of the Phase (MahaRERA Registration Number)situated on the Plot bearing C.N.No./CTSNo./Survery rl,o' 49/ 1/ A/1, 19 l4l'4./2 Final Plot no 23 Mauza No. -85:-: Wardha Plot demarcated by its boundaries (latitude and longitude of the end points) Lryout to the North Layout to the Sounth Ltyout to the East Road to the West Plot No. 21,22 of Division Wardhr Village taluka Waldha District Wardha Pin,{42001 admeasuling 542.56 sq.mts. area being dcveloped by [Promoterl For: MahaRERA resistration Number Sir', l/We Narendra B. Kedar ha\/e undefiaken assignnenl of certilyilg llstiinated Cost lbl the Subject Real Estate Projecl proposed to be registered under Vlah ERA, beilg N{ahalaxmi Residcucv building (s) I Wing(s) of the Phase silualed on tlre plot bearing C.N.No./CTS 16 No /Survey no 49l4lAll,49l4lAl2 .lFinal Plot ro 23 of Divisiou Wardha.village Wardha taluka wardha District Wardha Pin 442001 admeasuring 542.56 sq.mts. area being developed by [Owner/Promoter] 1 . Following technical professionals are appointed by Owner / Promoter :- (i) M/s Swapnil Khedekar as L.S./ Architect; (ii) M/s Dinesh Lakade as Sffuctural Consultant (iii) M/s Swapnil Khedekar as MEP Consultant (iv) MA R.R. Deshmukh as Quantity Surveyor 2. We have estimated the cost of the completion to obtain Occupation Certificate/Completion Cefiificate, of the Civil, MEP and Allied works, of the Buildings (s) of the project. Our estin.rated cost calculations are based on the Drawings/plans n.rade available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by R.R. Deshmukh quantity Surveyor appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion ofthe building (s) ofthe aforesaid project under reference as Rs. 1,55,33,848/- (Total of Table A). The estimated Tolal Cost of project is with retbrence to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation cedificate/completion cefiificate for the building(s) from the M.C. Wardha being the Planning Authority under whose jurisdication the atbresaid project is being implemented. 4. The Estimated Cost Incured till date is calculated at Rs. 31,06,7701 (Total of Table A and B). The amount of Estimated Cost Incured is calculated on the base of amount ofTotal Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building (s) of the subject project to obtain Occupation Certificate / Completion Certificate from. M.C. Wardha. 6. i celtiry thal the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A And B below : fable A Building / Wing Number - (to be prepared separately for each Building/ Wing of the Project) Sr. No. Pa11iculars Amounts I Total Estin.rated cost of the building/ Rs. 1,55,33,8481 Wings as on 3110712017 of Registration is 2. Cost incurred as on 31/07/2017 Rs. 1,24,27,078/- (based on the Estimated Cost) 3. Work done in Percentage (as 800h Percentage of the estin.rated cost) 1. Balance Cost to be Incurred (Based Rs. 3 I,06,770f on Estimated Cosl) 5. Cost Incufed on Additional /Extra Rs. Nil Items as on 10108/2017 not included in the Estimated Cost Table B (fo be prepared for the entire registered phase of the Real Estate Project) Sr. No. Parliculars Amounts 1 Total Estimated cost of the Intemal and Rs. External Development Works including amenities and Facilities in the Iayout as on date ofRegistration rs 2. Cost incuffed as on Rs. (based on the Estimated Cost) 3. Work done in Percenlage (as Percentage % ofthe estimated cost) 4. Balance Cost to be Incuned (Based on Rs. Estimated Cost) 5. Cost Incurred on Additional /Extra Rs. /- Items as on not included in the Estimated Cost Y Signature ofEngineer N.B.Kedar (Civil Engineer) + Note 1. The scope of work is to complete entile Real Estate Project as pet drarvings approved fonn time to time so as to obtain Occupation Certificate/ Completion Certiflcate 2. (*) Quantity suley can be done by office of Engineer or can be dome by an independent Quantity Sunr'eyor. whose cedificate of quantity calculated can be relied upon by the Engineer. ln case of independent quantity suNeyor being apPointed by Developer. the name has to be mentioned at the place marked (+) and iD case quantity are being calculated by office of Engineer, the nane of the person in the office of Engineer, who is responsible for the quantity calculated should be nentioned at the place marked (+). 3. The estimated cost includes all labour, material, equipment and machinery required to cafiy out entfe worK, 4. As this rs an estimated cost, any deviation in quantity required for development ofthe Real estate Proiect will result in amendment ofthe cost incured/to be incuned 5 All components ofwork wtth specifications are indicative and not exhaustive Arnexure A List of Extra/Additional Items executed with Cost (which were not paft of the original Estimate ofTotal Cost) Signature ofEngineer N.B,Kedar (Civil Engineer)