I /ATERIOR D-ES.TGNER.S Ottice i ,9.4a/.4adtgA{/r?dil'a,?. Swapnashilp, B.Arch. 34. KotwalNaga., Nagpur Architects & lnterior Dcsigners. Res : cA, /2003 /32295 Swapnashilp, Panel Architect/ Valuer Urbal Bank Ldt Sanrarth Nagar Lakhani. Bhandara. Ph. No ( 07186) 24541s Email.- swapnilkhedikal gmail com Mo No 9422830795 1. Following technical professionals are appointed by 0wner / Promoter :- (i) Shri Swapnil Khedikar as Architect; (iiJ Sh ri. Dinesh Lakade as Structural Consultant (iii) sh as Quantity Surveyor Based on Site Inspection, with respect to Single (1) Building of the aforesaid Real Estate Project, I certify that as on the date of thrs certificate, the Percentage of Work done for single (1) building of the Real Esrate Project as registered wide no. - _ - - - - under Maha RERA is as per table A herein below. The percentage of the work executed with respect to each of lhe activity of the entire phase is delailed in Table B. Table A Building /Wing Number _ (to be prepared separately for each Building /Wing ofthe Proiect) '2,/ Sr,No, Task & Activity Percentaee Of work done 1 Excavation 700 o/o ., One (1) number of Basement(s) and 700 o/o Plinth number of Podiums 4 ---( I number of Stilt Floor --- - | 5l number ofSlabs ofSuDer Structure 700 o/o 6 Internal walls, Inlernal Plaster, 100 o/o Floorings within Flats/Premises, Doors and windows to each of the Flat/Premiscs 7 Sanitary Fittings within the Flal/Premises, Sanitary - 90 7o Electrical Fittinss within the FIat/Premises Electrical 90 % I Staircases, Lifts Wells and Lobbies at each Staircase & Lift Well- 100 % Floor level connecting Slaircases and Lifts, overhead & water tanks- 100% Overhead and Underground Water Tanks LIFT - BO % 9 The external plumbing and external plaster, elevalion, completion of lerraces with L00 Va waterproofine of the Building/Wine, 10 Installation of lifts, water pumps, Fire Installation of lift - B0 % Fighting Fittings and Equipment as per CFO Common Areas - 80 7o NOC, Electrical fittings to Common Areas, Parking - 0 % electro, mechanicai equipmenl, Compliance to Compound wall - 100 % conditions ol environment /CRZ N0C, Finishing to entrance lobby/s, plinlh proteclion, paving of areas ippurtenant to Building/Wing Compound Wall and all other requirements as may be required to Obtain occuDation /comDletion Certifica te TABLE-B Internal&ExternalDevelopmentWolksinRespectoftheentireRegistered Phase Ploposed Percentage Details common AI eas, Facilities and ADlenities (Yes/No) Of Work Done 7 Internal Road & FothPath No 2 Water SuppLy Yes 100 o/o Yes 100 a/o Scptic l'ank 3 Sewage (charnber, line, SeDtic Tank, STPJ 4 Storm Water Drains No 5 Landscaping & Tree No Plantine 6 Street Light No 7 community Buildings No B Treatment and disPosal of No sewase and sullege water 9 Soild Waste manaBement & No Disposal Yes 100 o/o Llrin Watcr tlrr!.stjng 10 Water Consef vation, Rain Water harvesting Energy Management NO 11 72 Fire protection and fire No se fetv reouirement 700 o/o Electric Meter Koom L3 Electrical Meler room, sub' Yes station, receiving statlon other ( option to Add more) Yours Faithfully NrT-1831 (SWAPN]L S. KHEDIKAITJ Architect (License NO - CAl2003/32295 )