FORM-2A See MahaRERA order no. of 2018] ENGINEER'S CERTIFICATE FOR QUAITY ASSURANCE (site supervisor's certificate) To, The Raadhe Builder, Raam Laxman Sankul, Shop No.20 Amravati, Quality Assurance Certificate (Certificate no for the quarterending Sep 2 2 Subject :Certificate for quality of materials used and workmanship for the Work of No. of Building(s)/ quality of Construction and project situated on the plot Wings(s) of the Phase of the demarcated by its boundaries bearing C. S. No./C.T.S. No./ Survey No./Final (latitude and longitude of the end points) Survey plot no.123 North,Sai Nagar to Akoli Road 4 to the No.2 to the of District Amravati South, Plot No. 4 to the East Akoli Gaothan to the West PIN-444607admeasuring 688 sq.mtrs. area being developed by Raadhe Builder [Radhe Residency] Reference: MahaRERA Registration Number- P50300013532 Sir, Ihave undertaken an assignment of supervision of this real estate project. 1. Our Responsibility: - To carry out the work in accordance with the development permission and as per the approved plan and submit certificate of supervision of work and to carry out material the authorized laboratory and to ensure testing in-situ or in of work and quality L Material Testing /we, have applied following mandatory checks on the basic materials, used in the construction. i Cement It has been tested for its fineness, soundness, setting time, compressive strength etc. as per IS code 3535:1986 or as per other relevant IS/85/NBC code, or as per industry standards and its results are within the permissible limits. i. Coarse aggregate- t has been tested, for deleterious materials, clay lumps, crushing value, impact value as per IS 243011986 or as per other relevant IS/BS/NBC code or as per industry standards and its results are within the permissible limits. il. Bricks/ blocks They have been tested for water absorption, per other relevant IS/85/NBC code or as percrushing industry strength etc. as per I5 5454:1978 or as permissible limits. standards and its results are within v. Concrete/Ready-mix Concrete It has been tested for or as per other relevant compressive strength for various periods as per 15 456:2000 and I5 1199 IS/BS/NBC codes, as per industry standards and its results are within permissible limits. v. Steel for concrete- t has been tested as per IS 2062:2011 or as per other relevant IS/BS/NBC code or as per industry standards for tensile strength, elongation and gauge length etc. and its results are within permissible limits. vi. Testing of Other materials Other materials like sand, crushed sand, floor tiles, fixtures and fittings, pipes and sanitary fittings etc. (List out all items) used in this project conform to relevant IS/BS/NBC code or as per standards laid down by the Industry for a particular material. 2.Workmanship out under our supervision. We further certify /we hereby certify that work has been carried to the mark and the work has been that workmanship and quality is satisfactory and up deviations as per relevant code of practice. acceptable within the permissible limits of 3. Electrical Materials and workmanship:- installation/other electrical installations have Works of all the electrical wiring/connections/ift electrical engineer and its records has been been carried out under authorized/registered codes or as conform to the relevant I.S/ B.S/ National Building maintained. The materials used per industry standards. 4. Structural engineer: office n o - Mr.--having Licenses no. ---having Promoters has engaged structural engineer - - - Cell no under his supervision. He has in this project has been done The structural design of buildings consultation with soil consultant. before laying PCC for foundation in checked the soil report 10262:2009 or as per other mix design has been done as per Is The formwork and concrete certificates for STABILITY and SAFETY have checks and relevant codes as applicable. His periodic been kept on record. records: 5.Preservation of been properly kept in the prescribed formats and of this project have as required by any Record of all test results defect liability period or for the period least up to the will be preserved at other provision of law which were not conforming to the of work other item materials or any 6. Please specify and which w e r e not rejeded. Cpdke standard specifications vant D .Borkar B.E.Civil Nagar. A rayati Off. Pravin Yours Faithfully, Signature of Engineer (Site Supervisor) Name: License no.(if any)- Phone no0.- Place:- O tho de her t e limt