FORM-2A See MahaRERA order no. of2018] ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE (site supervisor's certificate) To, No.20 Amravati, The Raadhe Builder, Raam Laxman Sankul, Shop Quality Assurance Certificate eP og ending (Certificate no for the quarter and used and quality of Construction Subject:Certificate for quality of materials Phase of the workmanship for the Work of. No. of Building(s)/_ Wings(s) of the . no.123 S. No./C.T.S. No./ Survey No./Final plot project situated on the plot bearing C. end points) Survey No.2 to the demarcated by its boundaries (latitude and longitude of the to the West Plot No. 4 to the East Akoli Gaothan North,Sai Nagar to Akoli Road 4 to the South, 688 sq.mtrs. area being developed by Raadhe of District Amravati PIN-444607admeasuring Builder [Radhe Residency] Number-P50300013532 Reference: MahaRERA Registration Sir, of this real estate project. I have undertaken an assignment of supervision 1. Our Responsibility: with the development permission and as per the approved To carry out the work in accordance of work and to carry out material testing in-situ or in plan and submit certificate of supervision of work and the authorized laboratory and to ensure quality 1. Material Testing the basic materials, used in the construction. /we, have applied following mandatory checks on i. Cement etc. as per IS It has been tested for its fineness, soundness, setting time, compressive strength standards and its code 3535:1986 or as per other relevant IS/85/NBC code, or as per industry results are within the permissible limits. ii. Coarse ageregate It has been tested, for deleterious materials, clay lumps, crushing value, impact value as per IS 243011986 or as per other relevant I5/85/NBC code or as per industry standards and its results are within the permissible limits. ii. Bricks/ blocks - They have been tested for water absorption, crushing strength etc. as per IS 5454:1978 or as per other relevant IS/85/NBC code or as per industry standards and its results are within permissible limits. iv. Concrete/Ready-mix Concrete- It has been tested for compressive strength for various periods as per 15 456:2000 and IS 199 or as per other relevant IS/BS/NBC codes, as per industry standards and its results are within permissible limits. v.Steel for concrete t has been tested as per IS 2062:2011 or as per other relevant IS/BS/NBC code or as per industry standards for tensile strength, elongation and gauge length etc. and its results are within permissible limits. vi. Testing of Other materials Other materials like sand, crushed sand, floor tiles, fixtures and fittings, pipes and sanitary fittings etc. (List out all items) used in this project conform to relevant IS/BS/NBC code or as per standards laid down by the Industry for a particular material. 2. Workmanship /we hereby certify that work has been carried out under our supervision. We further certify that workmanship and quality is satisfactory and up to the mark and the work has been acceptable within the permissible limits of deviations as per relevant code of practice. 3. Electrical Materials and workmanship: Works of all the electrical wiring/connections/lift installation/other electrical installations have been carried out under authorized/registered electrical engineer and its records has been maintained. The materials used conform to the relevant I.5/ B.S/ National Building codes or as per industry standards. 4. Structural engineer: Promoters has engaged structural engineer Mr--having Licenses no. - --having office no- --.-cell no-- The structural design of buildings in this project has been done under his supervision. He has checked the soil report before laying PCC for foundation in consultation with soil consultant. The formwork and concrete mix design has been done as per Is 10262:2009 or as per other relevant codes as applicable. His periodic checks and certificates for STABILITY and SAFETY have been kept on record. M-2A formats for mats and and p rescribed prescribed i inn the the properly kept records: of have been een as required bv project for the period P r e s e r v a t i o n s. results of this period o r liability period test defect def t o the Re rd ofall at l e a s t up conforming confo rming to t the o the preserved we w er ree not n ot which which will be of law item of work work provision other other materials o r any e rejeded. not specify which were 6. Please 6. Ple specifications and standard Supervisor) Engineer (Site Signature of Name: Yours Faithfully, License no.(ifany)-- Phoneno.-- Place