FORM-2A See MahaRERA order no. of 2018] ENGINEER'S CERTIFICATE FOR QUAUTY ASSURANCE (site supervisor's certificate) To The Raadhe Builder, Raam Laxman Sankul, Shop No.20 Amravati, Quality Assurance Certificate (Certificate no_ for the quarter ending June 2ol9 Subject : Certificate for quality of materials used and workmanship for the Work of No. of Building(s)/_ quality of Construction and project situated on the plot Wings(s) of the Phase of the demarcated by its boundaries bearing C. S. No./C.T.S. No./ Survey No./Final plot no.123 North, Sai Nagar to Akoli Road 4(latitude and longitude of the to the South, Plot end points) Survey No.2 to the of District Amravati No. 4 to the East Akoli Gaothan to the PIN-444607admeasuring 688 sq.mtrs. area being Builder [Radhe Residencyl WVest developed by Raadhe Reference: MahaRERA Registration Number- P50300013532 Sir, Ihave undertaken an assignment of supervision of 1. Our Responsibility: this real estate project. To carry out the work in accordance with the plan and submit certificate development the authorized of supervision of permission and as per the laboratory and to ensure qualitywork and to carry out of work approved material testing in-situ or in 1. Material Testing and /we, have applied following mandatory checks on the i. Cement basic materials, used in the It has been construction. tested for its fineness, code 3535:1986 or as soundness, setting time, results are within the per other relevant IS/85/NBC code, compressive strength etc. as per IS i. Coarse aggregate- permissible limits. or as per industry standards and its It has been tested, for deleterious materials, clay 243011986 or as per other lumps, are within the relevant IS/BS/NBC code or as per crushing value, impact value as permissible limits. industry standards and its per IS results ii. Bricks/ blocks strength etc. as per IS 5454:1978 or as They have been tested for water absorption, crushing standards and its results are within code or as per industry per other relevant IS/85/NBC permissible limits. iv. Concrete/Ready-mix Concrete- iS 1199 It has been tested for compressive strength for various periods as per 15 456:2000 and as per industry standards and its results are within or as per other relevant IS/BS/NBC codes, permissible limits. v. Steel for concrete- code or as per or as per other relevant IS/BS/NBC It has been tested as per IS 2062:2011 results are and gauge length etc. and its industry standards for tensile strength, elongation within permissible limits vi. Testing of Other materials and sanitary floor tiles, fixtures and {ittings, pipes Other materials like sand, crushed sand, code or as per this project conform to relevant IS/BS/NBC fittings etc. (List out all items) used in material. standards laid down by the Industry for a particular 2. Workmanship: has been carried out under our supervision. We further certify /we hereby certify that work mark and the work has been is satisfactory and up to the that workmanship and quality of practice. limits of deviations as per relevant code acceptable within the permissible workmanship:- 3. Electrical Materials and electrical installations have wiring/connections/lift installation/other Works of all the electrical and its records has been authorized/registered electrical engineer been carried out under codes or as conform to the relevant I.S/ B.S/ National Building maintained. The materials used per industry standards. 4. Structural engineer:- Licenses no. ---having office no Promoters has engaged structural engineer Mr.--having - cell no He has has been done under his supervision. The structural design of buildings in this project soil consultant. checked the soil report before laying PCC for foundation in consultation with or as per other The formwork and concrete mix design has been done as per Is 10262:2009 STABILITY and SAFETY have checks and certificates for relevant codes as applicable. His periodic been kept on record. 5. Preservation of records: have been properly kept in the prescribed formats and Record of all test results of this project or for the period as required by any will be preserved at least up to the defect liability period other provision of law not conforming to the other item of work which were 6. Please specify materials or any not rejeded. standard specifications and which were Jayvan.D. Dork.r PCCivi Oft Pravin Nag Yours Faithfully, Signature of Engineer (Site Supenvisor) Name:--- License no.(if any)- Phone no.-- Place: