FORM-2A [See MahaRERA order no. of 2018] ENGINEER's CERTIFICATE FOR QUALITY ASSURANCE (site supervisor's certificate) To, The Raadhe Builder, Raam Laxman Sankul, Shop No.20 Amravati, Quality Assurance Certificate (Certificate no_ for the quarter endingM oLch 2o19 Subject :Certificate for quality of materials used and quality of Construction and workmanship for the Work of No. of Building(s)/__ Wings(s) of the Phase of the project situated on the plot bearing C. S. No./C.T.S. No./ Survey No./Final plot no.123 demarcated by its boundaries (latitude and longitude of the end points) Survey No.2 to the North,Sai Nagar to Akoli Road 4 to the South, Plot No. 4 to the East Akoli Gaothan to the West of District Amravati PIN-444607admeasuring 688 sq.mtrs. area being developed by Raadhe Builder [Radhe Residency Reference: MahaRERA Registration Number-P50300013532 Sir, I have undertaken an assignment of supervision of this real estate project. 1. Our Responsibility: - To carry out the work in accordance with the development permission and as per the approved plan and submit certificate of supervision of work and to carry out material testing in-situ or in the authorized laboratory and to ensure quality of work and 1. Material Testing I/we, have applied following mandatory checks on the basic materials, used in the construction. i. Cement- It has been tested for its fineness, soundness, setting time, compressive strength etc. as per IS code 3535:1986 or as per other relevant IS/85/NBC code, or as per industry standards and its results are within the permissible limits. - ii. Coarse aggregate It has been tested, for deleterious materials, clay lumps, crushing value, impact value as per IS 243011986 or as per other relevant IS/BS/NBC code or as per industry standards and its results are within the permissible limits. ii. Bricks/ blocks 5454:1978 or as crushing strength etc. as per IS They have been tested for water absorption, are within standards and its results relevant IS/85/NBC code or as per industry per other permissible limits. iv. Concrete/Ready-mix Concrete as per 15 456:2000 and IS 1199 strength for various periods thas been tested for compressive are within standards and its results IS/BS/NBC codes, as per industry other or as per relevant permissible limits. v.Steel for concrete- code or as per other relevant IS/BS/NBC tested as per IS 2062:2011 or as per and its results are It has been and gauge length etc. for tensile strength, elongation industry standards within permissible limits. materials vi. Testing of Other and sanitary fixtures and fittings, pipes crushed sand, floor tiles, code or as per Other materials like sand, conform to relevant IS/BS/NBC all items) used i this project fittings etc. (List out particular material. standards laid down by the Industry for a 2. Workmanship: We further certify out under our supervision. that work has been carried work has been V we hereby certify to the mark and the and quality is satisfactory and up that workmanship relevant code of practice. limits of deviations as per acceptable within the permissible Materials and workmanship: 3. Electrical installations have installation/other electrical electrical wiring/connections/lift Works of all the and its records has been under authorized/registered electrical engineer been carried out National Building codes or as maintained. The materials used conform to the relevant 1.S/ B.S/ per industry standards. 4. Structural engineer: Licenses no.-having office n o has engaged structural engineer Mr.--having Promoters - -cell no in this project has been done under his supervision. He has The structural design of buildings with soil consultant. PCC for foundation in consultation checked the soil report before laying or as per other has been done as per Is 10262:2009 The formwork and concrete mix design and SAFETY have checks and certificates for STABILITY relevant codes as applicable. His periodic been kept on record. 5.Preservation of records:- formats and results of this project have been properly kept in the prescribed Record of all test defect liability period or for the period as required by any at least up to the will be preserved other provision of law work which were not conforming to the materials or any other item of 6. Please specify and which were not rejeded. standard specifications JAyva.t. Vorkar B.E.Civil mravati f . Pravn Nanar, Yours Faithfully, Supervisor) Signature of Engineer (Site Name: License no.(if any)- Phone no.- Place: