FORM-2 [See Regulation 3l ENGINEER'S CERTIFICATE Date:15/09/2077 To, Radhe Builders B-L7, ltamlaxman Sankul, Sindhi Chowk, Amravati - 444603 Subiect: Certificate of Percentage of Completion of construction work of 1 Buildings of the Project [MahaRERA Registration Number - NA Being New Registration of Ongoing Project) Situated on the Survey No. 1 & 23, Plot No. 1, 2 & 3, Akoli Road, Amravati demarcated by its boundaries flatitude and longitude of the end Points) to the North to south to the East _ to the west of the division :- Amravati, village- Akoli, Taluka & District - r\mravati, PIN No. 444607 admeasuring 688.5B sq.mt areas being Developed by Radhe Builders, Amravati. Ref : MahaRERA Registration Number: NA[New Registration) Sir, I, Mr. fay Borkar have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being Survey No. 1 & 23, Plot No. 1, 2 & .l of division :- Amravati, village- Akoli, Taluka & District - Amravati, PIN No. 444607 admeasuring 688.58 sq.mt areas being Developed by Radhe Builders, Amravati. 1. l'ollowing technical professionals are appointed by Owner / Promoter :-- . Mr. Anand Deshmukh as [,,S, / Architecr: . Mr. Pankaj Deshmukh as structural Consultant . Mr. Anil Tonde as MEP Consultant . Mr. Rishabh Lakhde as a site supervisor 't. I havc estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of thc Civil, llEP and Allied works, of the Building[s) of the project. My estimated cost calculations are based on the Drawings/plans made available to me for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by me. -NA 3. I estimate Total Estimated Cost of ccnrpletion of the building(s) of the aforesaid project under reference as Rs. 1,,53,20,250/- (Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building[s) from the Amravati Municipal Corporation [AMC) being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 72,25,000/- [Total of Table A and B). The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building[s) of the subject project to obtain Occupation Certificate / Completion Certificate from Amravati N{unicipal Corporation IAMC) is estimated at Rs.80,95,250 (Total of Table A and BJ. 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: TABLE A Building called Radhe Residency Sr. No Particulars Amounts 1 Total Estimated cost of the building/wing Rs. 1,53,20,250/- as on L5/09/201,7 date of Registration is 2 Cost incurred as on LS /09 /201,7 Rs.72,25,000/- fbased on the Estimated cost ) 3 Work done in Percentage 47.000/o [as Percentage of the estimated cost ) 4 Balance Cost to be incurred Rs.80,95,250 (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra Items NIL as on not included in the Estimated Cost fAnnexure A) TABLE B Sr. No. Particulars Amounts 1 Total Estimated cost of the Internal and External Development NIL Works including amenities and Facilities in the layout as on date of Registration is NIL Cost incurred as on 2 [based on the Estimated cost) NIL - Work done in Percentage 3 [as Percentage of the estimated cost) NIL Balance Cost to be incurred NIL 4 (Based on Estimated Cost) Cost Incurred on Additional fExlra Items as on not 5 included in the Estimated Cost [Annexure A) w Yours Faithfully, Jay Borkar. - * Note : 1.The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain 0ccupation Certificate/Completion Certificate. 2.[x) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of indepenclent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked [*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked [*)' .l.The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4.As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 5.All components of work with specifications are indicative and not exhaustive' Annexure A List of Extra/Additional Items execttted with Cost NIL s[which were not part of the original Estimate of 'fotal Cost)