FORM 1 ARCHITECT’S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account – Building/Wing wise) To, Date: 07/07/2026 Tathey Realty, Amravati Subject: Certificate of Percentage of Completion of Construction Work of: Advik Nest having MahaRERA No. P50300080486 being developed by Tathey Realty as on (30/06/2026) Sir, I/ we Tejas Patil have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction work of Advik Nest having MahaRERA No. P50300080486. Based on Site Inspection, with respect to Layout/each of the Building / Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building / Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table-A Layout/Building/Wing Number (To be prepared separately for each Building /Wing of the Project) SrNo Tasks / Activity Percentage of Actual Work Done (1) (2) (As on date of the Certificate) 1 Excavation 100 2 Basements (if any) NA 3 Number of Podiums (if any) NA 4 Plinth 100 5 Stilt Floor NA 6 slabs of super structure 100 7 Internal walls, Internal Plaster, Floorings within 60 Flats/Premises, Doors and Windows to each of the Flat/Premises 8 Sanitary Fittings within the Flat/Premises. 30 9 Staircases, Lifts Wells and Lobbies at each Floor level 80 connecting Staircases and Lifts, Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 20 completion of terrace with the waterproofing of the building. 11 Installation of lifts, water pumps, Fire Fighting 0 Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC,Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE – B Common Areas (Internal and External Development Works) in respect of the Registered Phase/ Project Number S. No. Common Roads and Facilities, Amenities Proposed Percentage of Work Details (Yes/No) done 1 Internal Roads & Foothpaths NO NA 2 Water Supply YES 50 3 Sewerage (chamber, sewage lines), YES 80 Storm Water Drains 4 Storm Water Drains NO NA 5 Landscaping & Tree Planting NO NA 6 Street Lighting NO NA 7 Community Building NO NA 8 Treatment and disposal of sewage NO NA and sullage water 9 Solid Waste management & Disposal NO NA 10 Water conservation, Rain water YES 80 harvesting 11 Energy management NO NA 12 Fire protection and fire safety YES 0 requirements 13 Electrical meter room, sub-station, YES 40 receiving station 14 Other ---- NA Yours Faithfully, Signature & Name (IN BLOCK LETTERS) of L. S. / Architect (License no………………………….) Agreed and accepted by: Signature of Promoter Name: Rohit Tathe, Partner for Tathey Realty Date: 07-07-2026