FORM 1 [see Regulation 3) ARCHITECT'S CERTIFICATE Date :31-03-2022 To The SUBHASH DEVIDAS BHARSAKALE Deusha, Behind Atul Mangal Karyalaya, Rukhmini Nagar Amravati. 444607 Subject: Certificate of Percentage of Completion of Construction Work of SHIVAJI SANKUL -4- , No. of Building(s)/1 , Wing(s) of the FINAL Phase of the Project [MahaRERA Registration Number- P50300010756] situated on the Plot bearing C.N. No/CTS No./Survey no. 24/18, 24/lC, 24/lD &24/2 Final plot No. 12A from the S. No. 24/18, 24/lC, 24/lD & plot No.SPART & 6 PART from the S. No. 24/2 demarcated by its boundaries ( latitude and longitude of the end points) 37.97 MTS. to the North, 37.98 MTS. to the South, S0.49MTS. to the East, 51.40 MTS. to the West , of Division Amravati village AMRAVATI MUNICIPAL CORPORATION, taluka Amravati, District Amravati, PIN 444607,admeasuring 1474.10 sq.mts. area being developed by SUBHASH DEVIDAS BHARSAKALE Sir, I SUBHASH DEVIDAS BHARSAKALE have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the SHIVAJI SANKUL -4- Building 1 Wing 1 of the FINAL Phase of the Project, situated on the plot bearing C.N. No/CTS No./Survey no. 24/18, 24/lC, 24/lD &24/2 / Final plot No. 12A from the S. No. 24/18, 24/1 C, 24/lD & plot No. 5 PART & 6 PART from the S. No. 24/2 ofDivisionAmravati villageAMRAVATI MUNICIPAL CORPORATION, taluka Amravati, DistrictAmravati, PIN 444607, admeasuring 1474.10 sq.mts. area being developed by SUBHASH DEVIDAS BHARSAKALE 1. Following technical professionals are appointed by Owner/ Promoter:- (i) Shri SUBHASH DEVIDAS BHARSAKALE as Architect; (ii) Shri RAVIKANT MADHUSUDAN AGRAWAL as Structural Consultant (iii) M/s /Shri / Smt _ _ _ _ _ _ _ as MEP Consultant (iv) Ms. DHANASHREE D/O SUBHASH BHARSAKALE as Site Supervisor Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number P50300010756 under MahaRERA is as per table A herein below. The percentage of the wor.k executed with respect to each of the activity of the entire ohase is detailed in Table B. Table A Building- SHIVA)! SANKUL-4- Wing Number 1 Sr. No Tasks / Activity Percentage of work done 1 Excavation 95% 2 ONE nu mber of Plinth 100% 3 NIL number of Podiums NA 4 Stilt Floor 0% 5 Five number of Slabs of Super Structure 0% 6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/ Premises 0% 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/ Premises O% 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks 2% 9 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Buildi ng/Wing, 0% 10 Installation oflifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0% TABLE-B Internal & External Development Works in Respect of the entire Registered Phase S.No Common areas Proposed Percentage of Details and Facilities, (Yes/No) Work done Amenities 1. Internal Roads & NO NOT APPLICABLE NOT APPLICABLE Foothoaths 2. Water Supply YES 0% NOT STARTED 3. Sewarage YES 0% NOT STARTED (chamber, lines, Septic Tank, STP) 4. Storm Water NO NOT APPLICABLE NOT APPLICABLE Drains 5. Landscaping & NO NOT APPLICABLE NOT APPLICABLE Tree Plantino 6. Street Liahtina NO NOT APPLICABLE NOT APPLICABLE 7. Community NO NOT APPLICABLE NOT APPLICABLE Buildinas 8. Treatment and YES 0% disposal of NOT STARTED sewage and sullaoe water Solid Waste management & 9 Disoosal YES 0% NOT STARTED Water conservation, Rainwater 10 harvesting YES 0% NOT STARTED Energy 11. manaqement NO NOT APPLICABLE NOT APPLICABLE Fire protection and 12 NO NOT APPLICABLE NOT APPLICABLE fire safety requirements Electrical meter room, sub-station, 13 receivina station YES 0% NOT STARTED Others (Option to 14 Add more NO NOT APPLICABLE NOT APPLICABLE SUBHASHDE Signature & Name of L.S/ Architect (License NO - CA /80/5792)