FORM I [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of ongoing project and for withdrawal of Money from Designated Account) Date:2510912019 l'o Sumit Subhashrao Tangade, \/'u'ankatesh f-olon1,. SRPF Road, Ar-rrravati. Subject : certificate of completion of construction work of ('satrruda caves,, Building of project [MahaRERA Ragistration Number-P50300014143] situated on the Plot bearing No/CTS No..survey no. 5/1, / Final plol no. 32 demarcated by its boundaries ( latitude and longitude of the end points) Flot No. 31 to the North Plot No. 33 to the South Road to the East Service l,ane to the west of Angade nagar village Shegaon Taluka Amravati District Amravati PIN 444604 admeasuring 306.00 sq.mts. area being developed by Concrete Builder and Developer Pro.Pra. By Sumit Tangade. Sir, I Minal D. Sarda have undertaken assignment as Architect of certifying Completion of Construc',tion Work of 'oSatpuda Caves" Building situated on the plot bearing Survey No. 5/i. trinal Piot no. 32. of dngade nagar viltrage Shegaon Taluka Amravati District Amravati and measuring 306.00 sq.mts. area being developed by Concrete Builcler arro Developer Pro.Pra. By Sumit Tangade. '2. F'ollou'ing technical professionals are appointed by owner l Promoter:- (i) M/s/Shri/Smt Minal D. Sarda as L.S. i Architect (ii) M/s iShri / SmtSameer Shah as Structulal Consultant (iii) M/s /Shri/ Smt_Amol Chaudhg::tas MEP Consultant (iv) M/s /Shri / Smt Krishna S. Gurrta as Site Supervisor. Ba"sed on Site Inspection. with respect to each of the Building of the afloresaid Real Esti.re Project, I cerrili that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project as registered vide number P50300014143 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Building /Wing Number_(to be prepared separately for each Building /Wing of the Project) Sr. No Tasks /Activity Percentage of work done !1. 2 Qknumber of Basement(s) and Plinth Work Completed 4 Stilt Floor Work Completed 6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows Work Completed to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Work Completed Electrical Fittings within the Flat/Premises 8 Staircases. Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Work Completed Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, completion of terraces with Work Completed waterproofing of the Building 10 Installation of lift, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Finishing to Work Completed entrance lobby/s, plinth protection, paving of areas appurtenant to Building Compound Wall and all other requirements as may be required to Obtain Occupation / Completion Certificate TABLB.B Internal & External Develonment Works in Resnect of the entire Resistered Phase S.No Common areas and Proposed Percentage of Work Details Facilities, Amenities (YesAllo) done 1 Internal Roads & NO Footh-paths 2 Water Supply Yes 1000h Completed J Sewarage (chamber, lines, Septic Tank, Yes 100'/" Completed srP) 4 Storm Water Drains Yes 1000h Completed 5 Landscaping & Tree No Planting 6. Street Lighting No 7 Community No Buildings 8. Treatment and No disposal of sewage and sullage water 9 Solid Waste No management & Disposal 10 Water conservation, Yes l00Yo Completed Rain water harvesting l1 Energy management No t2 Fire protection and No fire safety requirements 13 Electrical meter Yes l00Yo Completed room Yours Faithfullv n A,>' Mi rc<) 4as.uc{ @r,,nu Signature & Name Ar, Minsl D. Sarda t {Architect lntcrior Dcsignart Reg. Ho. eN?l0{otflz1o