r*", SANCHIT Sanchit P. Patil s DCE, B.E. Civil, ME Construction Management (AP) Consulting Engineer Mob: 9096379451 CONTRAGTOR -2 [see Reg lation 3l ENG NEERI'S CER FICATE (To be submitted at the t me of Registra of Ongoing Project and for withdrawal Mo from Designa Account- Project wise) Date: Ol- o9 -Rol7 To GARDEN Survey No.l 812, je-Navsari Amravati, T . Dist. vati. Subject: Certi of ost lncurred fi Development for Construction ofM raa Bakul of the I Phase (MahaRERA Registration Num )si on the Plot ing C.N. No/CTS No./Survey no.1 ,Fi Plot no.01 ated by its boundaries (lati and of the points) to the North- ut of S.No.l 8/1, to the South - Sanctioned of S. o.128/:l to the - 12 mtr. wide Road, to the West- rnctio layout of S. .129 of Division village Na i, tal Amravati istrict Amravati PIN 444604 adm rring sc1.mts. being developed by [Promoter] Ref : RA ,gistration. Num Sir, I/ We Sa Prad Patil have en assignment of certifuing Estimated Cost for eSu Real Estate ject proposed to be registered under MahaRE being and Ba ul Building(s)/ of the lst phase situated on the pl bearin No/CTS o./Survey no.12\l2, Final plot: no.1 of Division village-N ri, Taluka-Amravati District Amravati, PIN sq.mts. area being developed by I terl l. Following profe:ssionals are appointed by Owner I Promoter:- (i) M/s/S mt ailenrlra Desh ukh as L.S. / Architect; (ii) M/s /S i/s Priti.,{bhay Tr lare as Structural Consultant (iii) M/s i/s as MEP Consultant (iu) M/s hri/S as Quantity Surveyor * 2. We have es. cost of the mpletion to obtain Occupation Certificatel ompleti Certificate, f the Civil, MEP and Allied works, of e Buil ing(s) of the project Our estimated cost calculations based on the Drawi 'plans made available to us for the project u r refe b'y the De loper and Consultants and the Schedule o items and quantity for the entire work as calculated tity Surveyor* appointed by Developer / and the a ion of the cost of material, labour and r inp made by dev and the site inspection carried out by -l J. We estimate Cost of ion of the building(s) of the aforesaid reference as Rs.653 631 ? zt- (Total of Table A and The imated Total of project is with reference to the Civil, Pa allied works uired to be completed for the purpose of ning ,cupation certifi / completion certificate for the buildings from the being the Planning Authority u jurisdiction the aforesaid project is being implemente 4. The Estima Cost ncurre