The Maharashtra Real Estate Regulatory Authority (General) Regulations 2017 FORM-2 [see Regulation] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and withdrawal of Money from Designated Account - Project wise) Date :15/09/2017 To The Shri. Abhijit S. Bobade partner Maharudra Infracombines Pvt. Ltd. First Floor ,Malviya Complex, Rathi Nagar, Amravati. Subject: Certificate of Cost Incurred for Development of [Project Name] for Construction of YASHASVI -3 building(s)/ 1 Wing(s) of the 1 Phase (MahaRERA Registration Number) situated on the plot bearing C.N. No/CTS No./Survey no./ Final Plot No 1 (One) S. No.186/1 demarcated by its boundaries (latitude and longitude of the end points) Road to the North SR. No.-186/1D to the South Plot 2A/2B to the East Road to the West of Division Amravati Village Amravati Taluka Amravati District Amravati PIN 444603 admeasuring 570.15 sq.mts. area being developed by[Promoter] Ref: MahaRERA Registration Number: NA (New Registration) Sir, I/We Rahul Rathi V.K. Colony, Gadgenagar, Amravati have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being 1 Building(s)/ 0 Wing(s) of the only Phase situated on the plot bearing C.N. No/CTS No./Survey no./ Final Plot no 1, 186/1 of Division Amravati village Amravati Taluka Amravati District Amravati PIN 444603 admeasuring 570.15 sq.mts. area being developed by [Owner/Promoter] The Maharashtra Real Estate Regulatory Authority (General) Regulations 2017 1. Following technical professionals are appointed by Owner / Promoter :- [i] M/s/Shri/Smt. Rahul Rathi as L.S. / Architect. [ii] M/s/Shri/Smt. Pankaj Deshmukh as Structural Consultant. [iii] M/s/Shri/Smt. ________________________ as MEP Consultant. [iv] M/s/Shri/Smt. ______________________ as Quantity Surveyor* 2. We have estimated the cost of the completion to obtain Occupation Certificate/Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by _______________ quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs. 1,95,00,000/- (Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the Amravati Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid projects is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 1,08,50,000/- (Total of Table A and B). The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from _________________ (planning Authority) is estimated at Rs. 86,50,000/- (Total of Table A and B). 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below : The Maharashtra Real Estate Regulatory Authority (General) Regulations 2017 TABLE A Building/Wing bearing Number 1 or called 1 (to be prepared separately for each Building/Wing of the Real Estate Project) Sr.No. Particulars Amounts 1. Total Estimated cost of the building/wing as on Rs. 1,95,00,000/- ______________ date of Registration is 2. Cost incurred as on ______________ Rs. 1,08,50,000/- (based on the Estimated cost) 3. Work done in Percentage (as Percentage of the 56% estimated cost) 4. Balance Cost to be Incurred Rs. 86,50,000/- (Based on Estimated Cost) 5. Cost Incurred on Additional/Extra Items as on Rs. ___________ ___________ not included in the Estimated Cost (Annexure A) TABLE B (to be prepared for the entire registered phase of the Real Estate Project) Sr.No Particulars Amounts 1. Total Estimated cost of the Internal and External Rs. ___________ Development Works including amenities and Facilities in the layout as on ____________ date of Registration is 2. Cost incurred as on ______________ Rs. ___________ (based on the Estimated cost) 3. Work done in Percentage Rs. ___________ (as Percentage of the estimated cost) 4. Balance Cost to be Incurred Rs. ___________ (Based on Estimated Cost) 5. Cost Incurred on Additional/Extra Items as on Rs. ___________ ___________ not included in the Estimated Cost (Annexure A)