CHANDELE D.B. CONSULTING CIVIL ENGR RUKHMINI NAGER AMRAVATI MOB NO: 9420125808, 9545755516 FORM-2 ENGINEER'S CERTIFICATE Date: 21/03/2018 To , The MAHALLE CONSTRUCTION ( RAVINDRA MAHALLE FOR SHREE GANESH RESIDENCY) Subject: Certificate of Cost Incurred for Development of [Project Name] for Construction of 1 building(s)/ Wing(s) of the -- Phase ( MahaRERA Registration Number)situated on the Plot bearing C.N. No/CTS No. Survey no.40/2/ Final Plot no 10 , Mouje : BENODA, Dist: Amravati-444606 demarcated by its boundaries ( latitude and longitude of the end points) PLOT NO 11 to the North 9M ROAD to the South SERVICE LANE to the East 7.5M ROAD to the West of Division AMRAVATI, Village AMRAVATI, Taluka AMRAVATI, Dist AMRAVATI, Pin-444606 admeasuring 504.00 sq.m area to be developed by (Prometer) Sir, I D B CHANDELE have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being 1 Building(s)/ Wings of the phase situated on the plot bearing no C.N. NO/CTS NO. / SURVEY NO. 40/2 , Plot NO. 10, of Division Amravati, Village Amravati, Taluka Amravati Dist Amravati Pin 4444606 admeasuring 504.00 sq.m area being developed by owner. 1. Following technical professionals are appointed by Promoter:- (i) Shri Rahul Farkade as L.S./ Architect (ii) Shri Pankaj Deshmukh as Structural Consultant (iii)Shri ____________________ as MEP Consultant (iv) Shri _______________ as Quantity Surveyor * 1 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by me quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs 1,21,18,500/- ( Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the A. M. C. AMRAVATI being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 1,21,18,500/- (Total of Table A and B)_. The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from A. M. C. AMRAVATI(planning Authority) is estimated at Rs 0/-( Total of Table A and B). 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below : 2 TABLE A Building /Wing bearing Number 1 or called (to be prepared separately for each Building /Wing of the Real Estate Project) Sr. No Particulars Amounts 1 Total Estimated cost of the Rs. 81,36,000 /- building/wing as on date of 2 Cost incurred as on Rs. 81,36,000 /- Registration is (based on the Estimated cost ) 3 Work done in Percentage 100% (as Percentage of the estimated cost ) 4 Balance Cost to be Incurred Rs. 0/- (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra Items Rs. 8,00,000 /- as on LIFT not included in the Estimated Cost (Annexure A) TABLE B (to be prepared for the entire registered phase of the Real Estate Project) Sr. No Particulars Amounts 1 Total Estimated cost of the Internal and External Rs. 3,00,000 /- Development Works including amenities and Facilities in the layout as on date of Registration is 2 Cost incurred as on Rs.3,00,000 /- (based on the Estimated cost ) 3 Work done in Percentage 100% (as Percentage of the estimated cost ) 4 Balance Cost to be Incurred Rs. 0 /- (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra Items Rs.28,82,500 /- as on LAND+TDR not included in the Estimated Cost (Annexure A) Yours Faithfully (Licence NO: MPL138) * Note 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate /Completion Certificate. 2. (*) Quantity survey can be done by office of Engineer or can be done by an Independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real estate Project will result in amendment of the cost incurred/ to be incurred. 5. All components of work with specifications are indicative and not exhaustive. Annexure A List of Extra / Additional Items executed with Cost (which were not part of the original Estimate of Total Cost)